Laserfiche WebLink
Water Main Plans ARCADIS) ............................................. ......... $0. 00 $519000, 00 <br /> (Lump Sum) <br /> Corridor Study (ARCADIS) .......................................................... $0. 00 $15, 581. 00 <br /> TOTAL PROFESSIONAL SERVICES................................. $339165. 00 $1, 7231839. 00 <br /> HOURLY RATE ALLOWANCES <br /> Allowance for Sketch and Legal <br /> Descriptions and staking of parcels(375 00leach) ................. NTE $0. 00 $61, 000. 00 <br /> Allowance for Survey Crew and Soft Dig <br /> Machine far Horizontal and Vertical <br /> Utility Locations at Potential Conflicts <br /> (Survey $112/Hr)...................................................................... NTE $0. 00 $201000. 00 <br /> Allowance for Survey and Design <br /> Of a transition to match the existing pavement <br /> At the north end of the project ................................................ NTE $0. 00 $12,000. 00 <br /> TOTAL HOURLYRATEALLOWANCES ........................... NTE $0. 00 $93, 000. 00 <br /> Page 4 of 5 <br /> G:\LNR Support\ADMIN\Marketing\Proposals\WPB\2008\66 th Ave Amendment No 4- 2- 12-08.doc <br />