Laserfiche WebLink
30% and 60% plans have been submitted to the County . Engineer will prepare 90% , and 100% <br /> plans . The plan modifications will consist of the following : <br /> • Modifications to the storm water drainage system to incorporate piping of the roadway <br /> runoff to the proposed detention area on 44th Avenue . <br /> • The preparation of construction plans for piping from 43 �d Avenue to the detention area <br /> site , and from the detention area site to connect to the existing piping system at SR 60 . <br /> • The preparation of construction plans for the pond site . <br /> • Obtaining seven (7) SPT soil test borings of the roadway and detention area site . <br /> E . The Roadway set of plans shall consist of the following : <br /> 30 % 60 % 90 % 100 % <br /> Cover Sheet X X <br /> Typical Sections X X <br /> Summary of Quantities and General Notes X X <br /> Summary of Drainage Structures Sheets X X <br /> Details X X <br /> Plan and Profile Sheets (40 scale) X X <br /> Cross Sections at 100 ft interval X X <br /> Landscape Plans X X <br /> Signage & Pavement Marking Plans ( 100 scale) X X <br /> Signalization Plans X X <br /> Bridge Plans X X <br /> Intersection Plan & Details X X <br /> Drainage Maps X X <br /> NPDES Plans X X <br /> Stormwater Pollution Prevention Plans ( SWPPP) X X <br /> Computation Book X <br /> Construction Cost Estimate and Quantities X X <br /> " SECTION IV - TIME FOR COMPLETION " is being modified to incorporate the following : <br /> Page 2 of 5 <br /> G : ALNR Support\ADMIN \Marketing\Proposals\WPB\2009\SR60 - 43RD AVE AMENDMENT 3 1 - 19-09 . doc <br />