My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-056
CBCC
>
Official Documents
>
2000's
>
2009
>
2009-056
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/2/2016 2:25:03 PM
Creation date
10/1/2015 3:17:53 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Third Amendment
Approved Date
03/03/2009
Control Number
2009-056
Agenda Item Number
8.S.
Entity Name
Arcadis G&M
Subject
SR 60 and 43rd Ave Improvements and Widening
Area
Intersection SR 60 and 43rd Ave.
Supplemental fields
SmeadsoftID
10471
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
30% and 60% plans have been submitted to the County . Engineer will prepare 90% , and 100% <br /> plans . The plan modifications will consist of the following : <br /> • Modifications to the storm water drainage system to incorporate piping of the roadway <br /> runoff to the proposed detention area on 44th Avenue . <br /> • The preparation of construction plans for piping from 43 �d Avenue to the detention area <br /> site , and from the detention area site to connect to the existing piping system at SR 60 . <br /> • The preparation of construction plans for the pond site . <br /> • Obtaining seven (7) SPT soil test borings of the roadway and detention area site . <br /> E . The Roadway set of plans shall consist of the following : <br /> 30 % 60 % 90 % 100 % <br /> Cover Sheet X X <br /> Typical Sections X X <br /> Summary of Quantities and General Notes X X <br /> Summary of Drainage Structures Sheets X X <br /> Details X X <br /> Plan and Profile Sheets (40 scale) X X <br /> Cross Sections at 100 ft interval X X <br /> Landscape Plans X X <br /> Signage & Pavement Marking Plans ( 100 scale) X X <br /> Signalization Plans X X <br /> Bridge Plans X X <br /> Intersection Plan & Details X X <br /> Drainage Maps X X <br /> NPDES Plans X X <br /> Stormwater Pollution Prevention Plans ( SWPPP) X X <br /> Computation Book X <br /> Construction Cost Estimate and Quantities X X <br /> " SECTION IV - TIME FOR COMPLETION " is being modified to incorporate the following : <br /> Page 2 of 5 <br /> G : ALNR Support\ADMIN \Marketing\Proposals\WPB\2009\SR60 - 43RD AVE AMENDMENT 3 1 - 19-09 . doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.