Laserfiche WebLink
Pond Surveys <br />0.00 $20,000.00 <br />Water Main PlansARCADIS)..............................................$51,000.00 $51,000.00 <br />(Lump Sum) <br />Corridor Study(ARCADIS)...................................................$15,581.00 $15,581.00 <br />TOTAL PROFESSIONAL SERVICES ............................... $1207106.00 $11690,674.00 <br />HO URL Y RA TE ALLOWANCES <br />Allowance for Sketch and Legal <br />Descriptions and staking of parcels(375.00%ach) ........ NTE $31,000.00 $61,000.00 <br />Allowance for Survey Crew and Soft Dig <br />Machine for Horizontal and Vertical <br />Utility Locations at Potential Conflicts <br />(Survey $112IHr)...................................................................... NTE $0.00 $20,000.00 <br />Allowance for Survey and Design <br />Of a transition to match the existing pavement <br />At the north end of the project ................................................. NTE $0.00 $12,000.00 <br />TOTAL HO URL Y RA TE ALL 0 WANCES ..................NTE $31,000.00 $93,000.00 <br />Page 5 of 6 <br />C:\Documents and Settings\aweragoda\Local Settings\Temporary Internet Files\OLK72\66 th Ave Amendment <br />No 3- 12-12-07.doc <br />