My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-049
CBCC
>
Official Documents
>
2000's
>
2008
>
2008-049
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2016 1:17:31 PM
Creation date
9/30/2015 11:58:47 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Third Amendment
Approved Date
02/12/2008
Control Number
2008-049
Agenda Item Number
7.I.
Entity Name
Arcadis
Subject
Amendment No.3 services contract
Bridge Replacements 66th Ave. widening
Area
South of SR 60 to 59th St.
Supplemental fields
SmeadsoftID
6896
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
"SECTION IV - TIME FOR COMPLETION" is being modified to incorporate the following : <br /> The time for completion of the 90% design drawings, permit applications, and Engineer's <br /> Opinion of Probable Construction Cost for the project shall be six (6) months from the date of <br /> execution of ADDENDUM No. 3 . Once permits are received, 100% design drawings shall be <br /> completed 90 days thereafter. Also, the first draft of the Corridor Study will be completed three <br /> (3) weeks from the date of execution of ADDENDUM No . 3 . Once IRC comments are received, <br /> final report shall be completed one ( 1 ) week thereafter. <br /> "SECTION V — COMPENSATION" is being modified to incorporate the following: <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered <br /> pursuant to this Agreement fees in accordance with the following: <br /> A. Professional Services Fee <br /> 1 . The basic compensation mutually agreed upon by the ENGINEER and the <br /> COUNTY follows: <br /> The following is a summary of costs. <br /> Charge Associated with <br /> Change in Project Scope New Total <br /> And Project Limits Compensation <br /> Geotechnical Services (Tierra) ...................................................... $0. 00 $130,010. 00 <br /> Engineering (ARCADIS)....................................................... $33,420. 00 $7607700. 00 <br /> SignalPlans(ARCADIS) ........................................................ $12,112. 00 $48,449. 00 <br /> Design SurveyffieAvenue) (ARCADIS)........................................ $0. 00 $169,500. 00 <br /> Design Survey(Sidestreets) (ARCADIS) ........................................... $0. 00 $ 71,428. 00 <br /> Right-of- Way Survey and Map( 6e Avenue) .......................... $17,993. 0 $127,821. 00 <br /> Right-of-way Survey (Sidestreets) .................................................... $0. 00 $611963. 00 <br /> Structural Design for 4 bridges <br /> (Bridge Design Associates, Inc.) ...................................................... $0. 00 $2071222. 00 <br /> Landscape & Irrigation .................................................................... $0. 00 $379000. 00 <br /> Page 4 of k• <br /> F :\Public Works\Capital Projects\66th Ave (SR 60 to CR 510)\66th Ave_ARCADIS_66th Ave SR60-59th <br /> St\Contracts and Agendas\66 th Ave Amendment No 3- 1 - 12-07.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.