Laserfiche WebLink
"SECTION IV - TIME FOR COMPLETION" is being modified to incorporate the following : <br /> The time for completion of the 90% design drawings, permit applications, and Engineer's <br /> Opinion of Probable Construction Cost for the project shall be six (6) months from the date of <br /> execution of ADDENDUM No. 3 . Once permits are received, 100% design drawings shall be <br /> completed 90 days thereafter. Also, the first draft of the Corridor Study will be completed three <br /> (3) weeks from the date of execution of ADDENDUM No . 3 . Once IRC comments are received, <br /> final report shall be completed one ( 1 ) week thereafter. <br /> "SECTION V — COMPENSATION" is being modified to incorporate the following: <br /> The COUNTY agrees to pay and the ENGINEER agrees to accept for services rendered <br /> pursuant to this Agreement fees in accordance with the following: <br /> A. Professional Services Fee <br /> 1 . The basic compensation mutually agreed upon by the ENGINEER and the <br /> COUNTY follows: <br /> The following is a summary of costs. <br /> Charge Associated with <br /> Change in Project Scope New Total <br /> And Project Limits Compensation <br /> Geotechnical Services (Tierra) ...................................................... $0. 00 $130,010. 00 <br /> Engineering (ARCADIS)....................................................... $33,420. 00 $7607700. 00 <br /> SignalPlans(ARCADIS) ........................................................ $12,112. 00 $48,449. 00 <br /> Design SurveyffieAvenue) (ARCADIS)........................................ $0. 00 $169,500. 00 <br /> Design Survey(Sidestreets) (ARCADIS) ........................................... $0. 00 $ 71,428. 00 <br /> Right-of- Way Survey and Map( 6e Avenue) .......................... $17,993. 0 $127,821. 00 <br /> Right-of-way Survey (Sidestreets) .................................................... $0. 00 $611963. 00 <br /> Structural Design for 4 bridges <br /> (Bridge Design Associates, Inc.) ...................................................... $0. 00 $2071222. 00 <br /> Landscape & Irrigation .................................................................... $0. 00 $379000. 00 <br /> Page 4 of k• <br /> F :\Public Works\Capital Projects\66th Ave (SR 60 to CR 510)\66th Ave_ARCADIS_66th Ave SR60-59th <br /> St\Contracts and Agendas\66 th Ave Amendment No 3- 1 - 12-07.doc <br />