Laserfiche WebLink
north of the North Relief Canal to north of 57`h Street. Included in these plans will be a phasing <br /> plan and a temporary detour plan. <br /> "SECTION III — SCOPE OF SERVICES" is being modified to incorporate the following: <br /> E . The Roadway set of plans shall consist of the following: <br /> 30 % 60 % 90 % 100 % <br /> Cover Sheet X X X X <br /> Typical Sections X X X X <br /> Summary of Quantities and General Notes X X <br /> Summary of Drainage Structures Sheets X X X <br /> Details X X <br /> Plan and Profile Sheets (40 scale) X X X X <br /> Cross Sections at 100 ft interval X X X <br /> Landscape Plans X X X <br /> Signage & Pavement Marking Plans ( 100 scale) X X X X <br /> Signalization Plans X X X <br /> Bridge Plans X X X <br /> Intersection Plan & Details X X X X <br /> Drainage Maps X X X <br /> Stormwater Pollution Prevention Plans ( SWPPP) X X <br /> Computation Book X <br /> Construction Cost Estimate and Quantities X X X X <br /> Water Main Plans X X X <br /> Page 3 of 6 <br /> G:\LNR Support\ADMIN\Marketing\Proposals\WPB\2007\66 th Ave Amendment No 3- 12- 12-07.doe <br />