Laserfiche WebLink
EXHIBIT 1 <br /> Identify all locations where asbestos containing material may be present but cannot be sampled, <br /> with the reason it cannot be sampled. Areas where access is impossible shall be indicated on the <br /> drawings with a notation as to why the areas could not and/or should not be fully investigated. <br /> Collect and analyze a sufficient number of bulk samples of all suspect ACM as may be <br /> warranted by site conditions. Quality assurance and chain of custody procedures outlined in <br /> Appendix B, Analytical Quality Assurance plan, Building Asbestos Survey Specifications (SV-Y 3- <br /> 789), DLES shall be followed. Sampling locations shall be documented on a set of reasonably <br /> scaled building floor plans or drawings or marked with an identification number corresponding to <br /> the representative sample number. Bulk samples shall be collected from materials in each <br /> homogeneous area to determine the asbestos content and to identify the complete content matrix of <br /> the material . Photographic documentation of each bulk sampling location, which includes the <br /> unique sampling number, shall be provided in each survey report. <br /> Bulk samples shall be analyzed utilizing PLM/DS techniques by a NVLAP-accredited laboratory . <br /> The analysis of bulk samples must identify the complete matrix of sample constituents consistent <br /> with the aforementioned Appendix B. Analytical Quality Assurance Plan . The analyst conducting <br /> the analysis shall have sufficient education, training and experience to perform the analysis in a <br /> competent manner. A resume of the analyst responsible for conducting the analysis as well as <br /> documentation of lab accreditation shall be provided in the survey report. <br /> Prepare a separate survey/assessment report, which summarizes the results of the survey for <br /> each parcel. The report shall include any and all documentation including lab analysis sheets, <br /> photographs, drawings, etc. which may be needed to substantiate the presence or absence, quantity, <br /> condition, and location of ACM. A copy of the report will be signed by the appropriate person <br /> licensed pursuant to F.S . 469.003-469.006, and a copy of said license provided. A draft copy of the <br /> report shall be submitted to the Department and the DLES. Regional Asbestos Coordinator for <br /> review and approval . Upon incorporation of review recommendations, four copies of the finalized <br /> report shall be distributed to the appropriate personnel . <br /> Foi facilities that do not contain ACM, the following shall he included in the survey report- <br /> a. Sufficient documentation to substantiate the absence of ACM . <br /> b . An appropriate number of photographs taken of the exterior and interior of the building <br /> to substantiate the absence of ACM in the building. <br /> c. A detailed description of the materials and methods of construction of each building. <br /> d . A completed "Check List for Buildings with No Known or Suspect ACM," Appendix H <br /> of the FDLES Building Asbestos Survey Specifications. <br /> e. The Asbestos Consultant shall certify to the best of his knowledge that the building <br /> contains no ACM. <br /> For unoccupied facilities that contain ACM, the following items, in addition to any of the <br /> applicable aforementioned items, will be included in the survey report. <br /> a. Management plan consisting of the following: <br /> - The building shall be secured as necessary to prevent entry by unauthorized persons . <br /> - The building will be posted with appropriate warning signs alerting persons to the <br /> Scope of Services PageA 6 of 10 <br /> Abatement, Demolition and Removal 41 of 55 <br />