My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-302
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2016 2:14:19 PM
Creation date
9/30/2015 11:08:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/11/2007
Control Number
2007-302
Agenda Item Number
11.C.1
Entity Name
Cross Environmental Services Inc.
Subject
Asbestos Abatement Agreement Demolition and Removal
Area
Old County Administration Bldg.
Supplemental fields
SmeadsoftID
6552
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br /> Identify all locations where asbestos containing material may be present but cannot be sampled, <br /> with the reason it cannot be sampled. Areas where access is impossible shall be indicated on the <br /> drawings with a notation as to why the areas could not and/or should not be fully investigated. <br /> Collect and analyze a sufficient number of bulk samples of all suspect ACM as may be <br /> warranted by site conditions. Quality assurance and chain of custody procedures outlined in <br /> Appendix B, Analytical Quality Assurance plan, Building Asbestos Survey Specifications (SV-Y 3- <br /> 789), DLES shall be followed. Sampling locations shall be documented on a set of reasonably <br /> scaled building floor plans or drawings or marked with an identification number corresponding to <br /> the representative sample number. Bulk samples shall be collected from materials in each <br /> homogeneous area to determine the asbestos content and to identify the complete content matrix of <br /> the material . Photographic documentation of each bulk sampling location, which includes the <br /> unique sampling number, shall be provided in each survey report. <br /> Bulk samples shall be analyzed utilizing PLM/DS techniques by a NVLAP-accredited laboratory . <br /> The analysis of bulk samples must identify the complete matrix of sample constituents consistent <br /> with the aforementioned Appendix B. Analytical Quality Assurance Plan . The analyst conducting <br /> the analysis shall have sufficient education, training and experience to perform the analysis in a <br /> competent manner. A resume of the analyst responsible for conducting the analysis as well as <br /> documentation of lab accreditation shall be provided in the survey report. <br /> Prepare a separate survey/assessment report, which summarizes the results of the survey for <br /> each parcel. The report shall include any and all documentation including lab analysis sheets, <br /> photographs, drawings, etc. which may be needed to substantiate the presence or absence, quantity, <br /> condition, and location of ACM. A copy of the report will be signed by the appropriate person <br /> licensed pursuant to F.S . 469.003-469.006, and a copy of said license provided. A draft copy of the <br /> report shall be submitted to the Department and the DLES. Regional Asbestos Coordinator for <br /> review and approval . Upon incorporation of review recommendations, four copies of the finalized <br /> report shall be distributed to the appropriate personnel . <br /> Foi facilities that do not contain ACM, the following shall he included in the survey report- <br /> a. Sufficient documentation to substantiate the absence of ACM . <br /> b . An appropriate number of photographs taken of the exterior and interior of the building <br /> to substantiate the absence of ACM in the building. <br /> c. A detailed description of the materials and methods of construction of each building. <br /> d . A completed "Check List for Buildings with No Known or Suspect ACM," Appendix H <br /> of the FDLES Building Asbestos Survey Specifications. <br /> e. The Asbestos Consultant shall certify to the best of his knowledge that the building <br /> contains no ACM. <br /> For unoccupied facilities that contain ACM, the following items, in addition to any of the <br /> applicable aforementioned items, will be included in the survey report. <br /> a. Management plan consisting of the following: <br /> - The building shall be secured as necessary to prevent entry by unauthorized persons . <br /> - The building will be posted with appropriate warning signs alerting persons to the <br /> Scope of Services PageA 6 of 10 <br /> Abatement, Demolition and Removal 41 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.