Laserfiche WebLink
EXHIBIT 1 <br /> asbestos hazard contained therein. <br /> A periodic inspection (weekly) of the building for breach of security will be performed. <br /> Appropriate documentation will be maintained of all events and repairs as performed. <br /> Abatement, as required under NESHAPS 40 C.F .R. Subpart M, Section 61 . 147, will be <br /> performed prior to demolition. <br /> Site security, posting and inspection activities shall be conducted by the Consultant. <br /> b. A completed "Survey Form", Appendix F, of the FDLES Building Asbestos Survey <br /> Specifications. <br /> c. An estimation of the costs of abatement for the removal of ACM as required by 40 <br /> C.F.R., Subpart M, Part 61 . 147 (NESHAPS) and other appropriate agency requirements. <br /> Operations and Maintenance (O&M) Plan Requirements <br /> If the asbestos survey identifies ACM in an occupied building and the established vacate date is within <br /> 180 days from the date the survey was performed, upon authorization from the Department the <br /> Consultant shall prepare a letter O & M Plan. The letter O & M Plan shall be addressed to the <br /> building occupants and shall simply and briefly address the location and type of ACM present and <br /> summarize any special material handling requirements. The letter O & M Plan shall be dated, signed <br /> and sealed by a licensed asbestos consultant and shall be prepared as an addendum to the asbestos <br /> survey report. The Consultant shall send the letter O & M Plan by Certified Mail, Return Receipt <br /> Requested, to the occupants within five (5 ) days, of FDLES approval of the survey report. <br /> If a facility will not be vacated within 180 days from the date of the survey, an O & M plan shall be <br /> prepared by the Consultant in accordance with Rule 381-40.009 and .010, F .A.C ., and using as a <br /> reference FDLES 's guide for the preparation of operation and maintenance plans and incorporating any <br /> recommendations made by the Asbestos Oversight Program Team. The Department' s Generic <br /> Program for Operations and Maintenance of Asbestos Containing Materials for Department Owned <br /> and Occupied Facilities may be utilized to develop the O & M Plan . The O & M plan shall address the <br /> fact that the facility is to be vacated and demolished and should consider such issues as the length of <br /> extended occupancy ; number of occupants; type of facility ; amount, location, condition and type of <br /> asbestos present; reinspection requirements and other information specific to Department acquired <br /> buildings that are scheduled for demolition. The plan shall be dated, signed and sealed by a licensed <br /> asbestos consultant and shall be submitted by the consultant to the FDLES Regional Asbestos Program <br /> Manager for review and approval within twenty-one (21 ) days of completion of the asbestos survey. <br /> Original O & M Plans and any subsequent revisions shall be sent Certified Mail, Return Receipt <br /> Requested, to the FDLES Regional Asbestos Program Manager for review and approval, with all <br /> certified mail receipts returned to the Department. The Department and the FDLES Asbestos Program <br /> Administrator shall be copied on all submittals. Revisions to the O & M plan shall be submitted to the <br /> appropriate agency within ten ( 10) calendar days of receipt of an agency review or recommendation <br /> letter. The Consultant shall provide an original of the O & M Plan to the tenant/occupant and the <br /> Department within five (5) days of FDLES approval of the plan. <br /> Abatement Specifications <br /> Scope of Services PageA 7 of 10 <br /> Abatement, Demolition and Removal 42 of 55 <br />