My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-302
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-302
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/22/2016 2:14:19 PM
Creation date
9/30/2015 11:08:18 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
09/11/2007
Control Number
2007-302
Agenda Item Number
11.C.1
Entity Name
Cross Environmental Services Inc.
Subject
Asbestos Abatement Agreement Demolition and Removal
Area
Old County Administration Bldg.
Supplemental fields
SmeadsoftID
6552
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
View images
View plain text
EXHIBIT 1 <br /> The asbestos Consultant shall develop an Architectural General Term Asbestos Abatement Project <br /> Manual to include a comprehensive set of asbestos abatement specifications that addresses the removal <br /> of any and all asbestos containing material that may be encountered on this Project. Abatement <br /> specifications shall be in compliance with all applicable federal, state and local regulations and <br /> requirements for the removal of regulated ACM from vacant state owned buildings scheduled for <br /> demolition. This includes, but is not limited to 40 C.F .R., Subpart M. Part 61 . 147 (NESHAPS), F .S. <br /> 255 .551 -.565 , F. S. 469.003-469.006 and any other appropriate agency guidelines or recommendations. <br /> The Asbestos Abatement Project Manual shall be in a format and of sufficient detail so as to be used <br /> as a Request for Bids and contract for the selection/procurement of a licensed asbestos abatement <br /> contractor. The Asbestos Consultant shall include in the Project Manual a Unit Price Schedule for <br /> specific abatement activities that will be utilized to establish abatement costs. Abatement shall be <br /> conducted for the established unit fee on an as needed basis . Abatement specifications shall be signed <br /> by the Asbestos Consultant, licensed pursuant to F.S . 469.003 -469 .006. A General Term Asbestos <br /> Abatement Project Manual shall be submitted to the Department. Any revisions shall be <br /> submitted to the Department within five (5) days of receipt of request for revisions. <br /> Abatement Supervision/Final Clearance Resort <br /> Asbestos Consultant shall provide all necessary services and equipment required to provide abatement <br /> supervision, air monitoring and final building clearance for all facilities that require asbestos abatement <br /> prior to or as part of demolition. These oversight services include, but are not necessarily limited to, <br /> the following: <br /> a. Conduct pre-construction conferences and inspections with the abatement contractor in order to <br /> clarify the scope of work, establish time frames and resolve any technical issues pertaining to <br /> the authorized abatement project. <br /> b. Conduct daily monitoring of all asbestos abatement and related activities. Develop and maintain a <br /> log of all monitoring activities which include a description of events, times and personnel involved. <br /> Asbestos abatement/project monitors shall be appropriately trained/certified for supervision of <br /> Asbestos Abatement Projects. <br /> c. Identify, resolve and document any discrepancies in abatement activities which are not in <br /> compliance with the asbestos abatement contract and abatement specification . Immediately <br /> notify the Department of any significant incidents. <br /> d. Conduct all ambient air monitoring activities as requested. This shall include but not limited to, <br /> air sampling, field and lab PCM analysis and final reporting, when necessary. Pre-abatement <br /> and final clearance air monitoring analysis shall be conducted offsite by the designated <br /> analytical laboratory . <br /> e. Upon completion of asbestos abatement, conduct final clearance inspection and any required <br /> sampling necessary to obtain all required agency sign-offs and approvals. <br /> f Within three (3 ) days of completion of the approved final clearance inspection, submit to the <br /> Department a Visual Inspection/Final Clearance Certification Letter, which includes a signed <br /> statement by the consultant that the abatement project was performed and completed in <br /> compliance with all abatement specifications. <br /> g. Provide four (4) copies of a final clearance report summarizing asbestos abatement <br /> activities associated with each completed abatement project. Complete all related <br /> Scope of Services PageA 8 of 10 <br /> Abatement, Demolition and Removal 43 of 55 <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).