EXHIBIT 1 <br /> The asbestos Consultant shall develop an Architectural General Term Asbestos Abatement Project <br /> Manual to include a comprehensive set of asbestos abatement specifications that addresses the removal <br /> of any and all asbestos containing material that may be encountered on this Project. Abatement <br /> specifications shall be in compliance with all applicable federal, state and local regulations and <br /> requirements for the removal of regulated ACM from vacant state owned buildings scheduled for <br /> demolition. This includes, but is not limited to 40 C.F .R., Subpart M. Part 61 . 147 (NESHAPS), F .S. <br /> 255 .551 -.565 , F. S. 469.003-469.006 and any other appropriate agency guidelines or recommendations. <br /> The Asbestos Abatement Project Manual shall be in a format and of sufficient detail so as to be used <br /> as a Request for Bids and contract for the selection/procurement of a licensed asbestos abatement <br /> contractor. The Asbestos Consultant shall include in the Project Manual a Unit Price Schedule for <br /> specific abatement activities that will be utilized to establish abatement costs. Abatement shall be <br /> conducted for the established unit fee on an as needed basis . Abatement specifications shall be signed <br /> by the Asbestos Consultant, licensed pursuant to F.S . 469.003 -469 .006. A General Term Asbestos <br /> Abatement Project Manual shall be submitted to the Department. Any revisions shall be <br /> submitted to the Department within five (5) days of receipt of request for revisions. <br /> Abatement Supervision/Final Clearance Resort <br /> Asbestos Consultant shall provide all necessary services and equipment required to provide abatement <br /> supervision, air monitoring and final building clearance for all facilities that require asbestos abatement <br /> prior to or as part of demolition. These oversight services include, but are not necessarily limited to, <br /> the following: <br /> a. Conduct pre-construction conferences and inspections with the abatement contractor in order to <br /> clarify the scope of work, establish time frames and resolve any technical issues pertaining to <br /> the authorized abatement project. <br /> b. Conduct daily monitoring of all asbestos abatement and related activities. Develop and maintain a <br /> log of all monitoring activities which include a description of events, times and personnel involved. <br /> Asbestos abatement/project monitors shall be appropriately trained/certified for supervision of <br /> Asbestos Abatement Projects. <br /> c. Identify, resolve and document any discrepancies in abatement activities which are not in <br /> compliance with the asbestos abatement contract and abatement specification . Immediately <br /> notify the Department of any significant incidents. <br /> d. Conduct all ambient air monitoring activities as requested. This shall include but not limited to, <br /> air sampling, field and lab PCM analysis and final reporting, when necessary. Pre-abatement <br /> and final clearance air monitoring analysis shall be conducted offsite by the designated <br /> analytical laboratory . <br /> e. Upon completion of asbestos abatement, conduct final clearance inspection and any required <br /> sampling necessary to obtain all required agency sign-offs and approvals. <br /> f Within three (3 ) days of completion of the approved final clearance inspection, submit to the <br /> Department a Visual Inspection/Final Clearance Certification Letter, which includes a signed <br /> statement by the consultant that the abatement project was performed and completed in <br /> compliance with all abatement specifications. <br /> g. Provide four (4) copies of a final clearance report summarizing asbestos abatement <br /> activities associated with each completed abatement project. Complete all related <br /> Scope of Services PageA 8 of 10 <br /> Abatement, Demolition and Removal 43 of 55 <br />