Laserfiche WebLink
EXHIBIT 2 <br /> ,. � 3 , <br /> NEWIN <br /> ITEM # DESCRIPTION QUANTITY UNIT $ TOTAL <br /> , p <br /> 5.4. 1 JEngineering Plan Fee per plan $100. 001s <br /> MEW <br /> A001 ASBESTOS Survey and Report per Parcel 1 $900 .00 $900.00 <br /> 7002 Operation & Maintenance Plan per Parcel 1 $ 100 .00 $100.00 <br /> A003 Asbestos Airborne Fiber Assessment shift rate 1 $500 .00 $500.00 <br /> A004 O & M Implementation & reinspection activities shift rate $350 .00 $ <br /> A005 Abatement Specifications unit rate 1 $150 .00 $150.00 <br /> A006 Asbestos Abate.Suprvsr & Demo. Monitoring per shift 1 1 $500.00 $500.00 <br /> A007 JAbatement & Demolition , Final Clearance Report unit rate 1 $500. 00 $500.00 <br /> B001 Mobilization for projects requiring full isolation $ 1 .00 $ <br /> B002 Mobilization for projects requiring limited isolation-exterior $ 1 .00 $ <br /> 7003 Daily rate for field office per day $ 1 .00 $ <br /> t <br /> B004 . 100 Remove insulation from boilers , stacks, & ducts square foot $2 .00 $ <br /> 13004 .200 Remove ins . from straight-run pipe (<6" in diameter) lineal ft. $2 .00 $ <br /> 13004 .300 Remove ins . from fittings (assoc. w/pipe <6" diam) per fitting $2 .00 $ <br /> B004 .400 Remove metal jackets from pipe (<6" diam) lineal foot $2 .00 $ <br /> 7004. 500 Remove ins . from straight-run pipe (>6" diam ) lineal foot $2 .00 $ <br /> 3004.600 Remove ins . from fittings (assoc. w/pipe >6" diam) per fitting $2 .00 $ <br /> 6004. 700 Remove gaskets from flanges , boilers , flue & fittings lineal ft. $2 .00 $ <br /> B004 .800 Remove metal jackets from pipe (>6" diam) lineal foot $2 . 00 $ <br /> s ' <br /> B005 . 1O0 Remove insulation from boilers, stacks , & ducts square foot $2 ,00 $ <br /> B005 .2O0 Remove ins . From straight-run pipe (<6" diam) lineal foot $ 12 .00 $ <br /> 13005 .300 Remove ins . from fittings (assoc. w/pipe <6" diam) per fitting $2 .00 $ <br /> 13005 .400 Remove metal jackets from pipe (<6" diam) lineal foot $ 1 .00 $ <br /> 13005 .500 Remove ins. from straight-run pipe (>6" diam) lineal foot $ 12 .001 $ <br /> 13005 .600 Remove metal jackets from pipe (>6" diam) lineal foot $ 1 .00 $ <br /> '. m1 _. ' P1AlIt1 • ._ . . <br /> 13006. 100 Remove ACM & overspray from ceiling, walls , beams <br /> & structural members/surfaces square foot1 $5 .00 $ <br /> 8006.200 Remove ACM plaster & lathe systems incl all surfacing materials sf $6 .00 $ <br /> 8006 .300 Remove ACM sheetrock (wallboard) incl all surfacing materials sf $2 .50 $ <br /> 8006.400 Remove ACM fireproofing from steel beams/bar joists & <br /> corrugated metal deck & misc. overspray sq . ft. $ 10 . 00 $ <br /> 8006 .500 Remove ACM fireproofing from steel beams/bar joists & <br /> concrete deck & misc. overspray square foot $ 10.00 $ <br />