Laserfiche WebLink
EXHIBIT 2 <br /> � f r <br /> ITEM # DESCRIPTION QUANTITY UNIT $ TOTAL <br /> 8007. 100 Remove floor file square foot <br /> 2 .501 $ <br /> 6007 .200 Remove floor file and mastic adhesive square foot <br /> 3 .001 $ <br /> 6007.300 Remove additional layers greater than one of floor file sq . ft. $ 1 .00 $ <br /> 13007.400 Remove sheet vinyl square foot $3.50 $ <br /> 8007 .500 Remove sheet vinyl and mastic adhesive square foot $3 . 50 $ <br /> 3007 .600 Remove additional layers greater than one of sheet vinyl sf $0 .50 $ <br /> 6007 .700 Remove floor mastic and coatings $0.50 $ <br /> 13007. 800 Remove carpet as ACM $0 .50 $ <br /> B007. 900 Remove ceiling tile & ceiling materials , grid system & hangers sf $2 .00 $ <br /> 13007.010 Remove wood sub-floor & mastic adhesive $2 .00 $ <br /> 13007.011 Remove concrete sub-floor & mastic adhesive $ 1 . 00 $ <br /> 6007 .012 Remove asbestos cement panels on interior & exterior of <br /> building incl covered walkways square foot $3.00 $ <br /> 13007 .013 Remove vibrator dampers $2 .00 $ <br /> 6007 .014 Remove wallboard $2 .50 $ <br /> B007.015 Remove metal ductwork system & assoc. mastics sq . ft. $2.00 $ <br /> 8007 . 016 Remove board & insulated ductwork system square foot $ <br /> 8007. 017 Remove sinks with insulation per sink $3 .00 $ <br /> W maim <br /> 6008. 100 Remove cement roof shingles square foot $3 .00 $ <br /> 13008 .200 Remove built-up roofing including flashing & felts sq . ft. $3 .00 $ <br /> B008 .300 Remove composition & roof shingles & felts including flashing sf $3.00 $ <br /> B008 .400 Remove rolled roof & felts including flashing square foot $3.00 $ <br /> B008. 500 Remove wood shingles & felts including flashing square foot $2 .50 $ <br /> 8008.600 Remove mobile home roof coating square foot $3.50 $ <br /> Minn" <br /> 8009. 100 Provide properly trained & certified manpower to perform <br /> misc. asbestos abatement/cleanup activity per hour $40 .00 $ <br /> B009 .200 Provide manpower to perform misc demolition activities as <br /> necessary to access ACM per hour $40 .001 $ <br /> PROJECT MANAGER: i <br /> Charles L. Gray <br /> DATE: 8/20/07 <br />