Laserfiche WebLink
• Renovate kitchen, install new appliances (LP range and hot water heater) . Install 1000 gal <br /> LP tank for the appliances . <br /> • Update training room, which will be the back up location for the administration office <br /> located in station # 1 . <br /> • Install pad mounted diesel generator with automatic transfer switch . This will require a new <br /> under ground electrical service for the building . The current service is 200 amps and <br /> overhead . <br /> • Install 4 impacted rated roll up doors . <br /> • Remove/replace shingles on mansard roof with metal roofing. <br /> • Verify the mansard framing is structurally sound and attached to building properly . Bring <br /> up to code if necessary . <br /> • Barth will provide an estimate to install light gauge metal trusses over existing flat roof <br /> areas . <br /> • Relocate roof top A/C condensing units to the ground <br /> * * * *The following items were added to the scope of work for Station #3 at the monthly progress <br /> meeting held 5.25.05 * * * * * * * * * <br /> • Barth Construction is to provide a separate price to install a fire sprinkler system for the <br /> building <br /> • Verify the condition and repair any loose stones on the building fagade <br /> • Add approximately 500 Sq . Ft of covered storage area near the existing service area <br /> 13 <br />