My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-201
CBCC
>
Official Documents
>
2000's
>
2005
>
2005-201
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2016 10:08:00 AM
Creation date
9/30/2015 8:50:35 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
06/07/2005
Control Number
2005-201
Agenda Item Number
14.A.3
Entity Name
Barth Construction ,Inc.
Subject
Fire Station #6 renovations
Attachment 2 to Agreement
Area
Fire Station #6
Supplemental fields
SmeadsoftID
4982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT "A " <br /> * * * * The scope of work for Station #6 was revised at the Kick Off meeting held April 2e, 2005 at Joe <br /> Baird's Office. See meeting minutes for other items discussed at this meeting. Bold items were <br /> changed/added at this meeting <br /> April 22 , 2005 <br /> Battalion Chief Ed Prime <br /> Indian River County Fire Department <br /> 1500 Old Dixie Hwy <br /> Vero Beach, Florida 32960 <br /> Re : Indian River County Fire Station 96 <br /> Chief Prime , <br /> The following is the scope of work you requested to be performed at Indian River County Fire Station . We <br /> are currently in the process of determining the GMP and construction schedule based on the work. If you <br /> would like to change or add to this list, please do so in writing as soon as possible . <br /> Building Exterior <br /> Replace roof shingles on entire building, install continuous cleat drip edge <br /> Remove existing siding on high gable end over lower roof <br /> Repair any damaged, rotten wood and repair flashing behind this high gable end <br /> Replace siding on high gable end with Hardi Plank siding or equivalent <br /> Remove all existing exterior siding below the soffits, install stucco over existing block walls <br /> Remove existing siding on the large East and West gable ends , replace with Hardi Plank siding or similar . <br /> Includes any framing necessary to install new siding <br /> Repair any damaged, rotten wood and flashings behind existing siding <br /> Repair any damaged or rotten soffit and fascia boards and framing <br /> Replace soffit vent screen material with a vinyl soffit vent material (Vinyl Corp . or similar) <br /> Remove all four raised planters that are against the exterior walls, install new siding in these areas . <br /> Pressure clean and paint exterior of building, including garage bays ( all materials and equipment stored in <br /> bay will need to be removed during this process) . <br /> Install two wind loaded 12 ' x 12 ' motorized roll up garage doors <br /> Replace all light fixtures inside the garage bays <br /> Re install existing hurricane shutter hardware <br /> Seleetive tree trimmingon the East aim of the building <br /> Close up the large gable end vents on the East and West side of the building. <br /> Repair any damaged landscape/ irrigation caused by this project <br /> Building Interior <br /> Remove all existing ceiling grid , tile and above ceiling insulation through out building <br /> Install new craft back R- 19 insulation at the bottom cord of existing trusses . <br /> Install an air barrier through out building consisting of one layer of 5 /8" Type X gypsum board to under <br /> side of existing trusses <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.