35 . Project Manual--The bound documentary 44 . Supplementary Conditions—That part of the -
<br /> information prepared for bidding and constructing the Contract Documents which amends or supplements these
<br /> ' Work. A listing of the contents of the Project Manual, General Conditions.
<br /> which may be bound in one or more volumes, is contained
<br /> in the table(s) of contents. 45 . Supplier—A manufacturer, fabricator, suppli-
<br /> er, distributor, materialman, or vendor having a direct
<br /> 36 . Radioactive Material—Source, special nucle- contract with CONTRACTOR or with any Subcontractor to
<br /> ar, or byproduct material as defined by the Atomic Energy furnish materials or equipment to be incorporated in the
<br /> Act of 1954 (42 USC Section 2011 et seq.) as amended Work by CONTRACTOR or any Subcontractor.
<br /> ' from time to time.
<br /> 46. Underground Facilities—All underground
<br /> 37. Resident Project Representative--The autho- pipelines, conduits, ducts, cables, wires, manholes, vaults,
<br /> rized representative of ENGINEER who may be assigned to tanks, tunnels, or other such facilities or attachments, and
<br /> the Site or any part thereof. any encasements containing such facilities, including those
<br /> that convey electricity, gases, steam, liquid petroleum
<br /> 38 . Samples—Physical examples of materials, products, telephone or other communications, cable
<br /> ' equipment, or workmanship that are representative of some television, water, wastewater, storm water, other liquids or
<br /> portion of the Work and which establish the standards by chemicals, or traffic or other control systems .
<br /> which such portion of the Work will be judged.
<br /> 47. Unit Price Work—Work to be paid for on the
<br /> 39. Shop Drawings--All drawings, diagrams, basis of unit prices.
<br /> illustrations, schedules, and other data or information which
<br /> are specifically prepared or assembled by or for CON- 48 . Work—The entire completed construction or
<br /> TRACTOR and submitted by CONTRACTOR to illustrate the various separately identifiable parts thereof required to
<br /> some portion of the Work. be provided under the Contract Documents. Work includes
<br /> and is the result of performing or providing all labor,
<br /> ' 40. Site—Lands or areas indicated in the Contract services, and documentation necessary to produce such
<br /> Documents as being furnished by OWNER upon which the construction, and furnishing, installing, and incorporating
<br /> Work is to be performed, including rights-of-way and all materials and equipment into such construction,
<br /> all as
<br /> easements for access thereto, and such other lands furnished required by the Contract Documents.
<br /> by OWNER which are designated for the use of
<br /> CONTRACTOR 49 . Work Change Directive--A written statement
<br /> to CONTRACTOR issued on or after the Effective Date of
<br /> ' 41 . Specifications—That part of the Contract the Agreement and signed by OWNER and recommended
<br /> Documents consisting of written technical descriptions of by ENGINEER ordering an addition, deletion, or revision
<br /> materials, equipment, systems, standards, and workmanship in the Work, or responding to differing or unforeseen
<br /> as applied to the Work and certain administrative details subsurface or physical conditions under which the Work is
<br /> ' applicable thereto . to be performed or to emergencies . A Work Change
<br /> Directive will not change the Contract Price or the Contract
<br /> 42 . Subcontractor—An individual or entity having Times but is evidence that the parties expect that the change
<br /> ' a direct contract with CONTRACTOR or with any other ordered or documented by a Work Change Directive will be
<br /> Subcontractor for the performance of a part of the Work at incorporated in a subsequently issued Change Order
<br /> the Site. following negotiations by the parties as to its effect, if any,
<br /> ' on the Contract Price or Contract Times.
<br /> 43 . Substantial Completion—The time at which
<br /> the Work (or a specified part thereof) has progressed to the 50. Written Amendment—A written statement
<br /> point where, in the opinion of ENGINEER, the Work (or a modifying the Contract Documents, signed by OWNER and
<br /> ' specified part thereof) is sufficiently complete, in CONTRACTOR on or after the Effective Date of the
<br /> accordance with the Contract Documents, so that the Work Agreement and normally dealing with the nonengineenng or
<br /> (or a specified part thereof) can be utilized for the purposes nontechnical rather than strictly construction-related aspects
<br /> for which it is intended. The terms "substantially complete" of the Contract Documents.
<br /> and "substantially completed" as applied to all or part of the
<br /> Work refer to Substantial Completion thereof.
<br /> 00700 - 8