My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-348.C
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-348.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2017 2:23:02 PM
Creation date
9/30/2015 7:10:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/16/2003
Control Number
2003-348.C
Agenda Item Number
11.I.4
Entity Name
Barth Construction
Subject
Contract and Specifications Kitching Station Trailhead
Area
North County Regional Park
Project Number
0219
Bid Number
5099
Archived Roll/Disk#
3208
Supplemental fields
SmeadsoftID
3566
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . 02 Terminology - <br /> A. Intent of Certain Terms or Adjectives <br /> 2 . The-werd «insta4l,„ when used in eemee- <br /> 1 . Whenever in the Contract Documents the fien with-serviees, materials , er equipment-, shall <br /> terms "as allowed," "as approved," or terms of like mean to pu4 We use or- plac-e in final pesitien said. <br /> effect or import are used, or the adjectives "reasonable," serviees, maerials, <br /> "suitable," "acceptable," "proper," "satisfactory," or ready fer- intended use. <br /> adjectives of like effect or import are used to describe <br /> ' an action or determination of ENGINEER as to the 3 . The werds`der m}" er"grevide," when <br /> Work, it is intended that such action or determination fed in cv;3eefien with services, materials, eF <br /> will be solely to evaluate, in general, the completed mentt, shall mean to fionish and insta]4 <br /> said <br /> Work for compliance with the requirements of and , <br /> ' information in the Contract Documents and confor- €er-inteaded use. <br /> mance with the design concept of the completed Project <br /> as a functioning whole as shown or indicated in the Paragraph DA has been deleted in its entirety. <br /> ' Contract Documents (unless there is a specific statement 4 . When "€pis " "install," 4!r em�er '!Pr-e- <br /> indicating otherwise). The use of any such term or vide" is net used in eenneetieev4ffi—ser,z�s; <br /> adjective shall not be effective to assign to ENGINEER matefials, <br /> any duty or authority to supervise or direct the an obligatien e€ G01h :RAG1 QPr,4!previde" is <br /> performance of the Work or any duty or authority to imglied. <br /> undertake responsibility contrary to the provisions of <br /> paragraph 9. 10 or any other provision of the Contract E. Unless stated otherwise in the Contract Docu- <br /> Documents. ments, words or phrases which have a well-known technical <br /> or construction industry or trade meaning are used in the <br /> B . Day Contract Documents in accordance with such recognized <br /> ' meaning. <br /> 1 . The word "day" shall constitute a <br /> calendar day of 24 hours measured from midnight to <br /> the next midnight. ARTICLE 2 - PRELIMINARY MATTERS <br /> C. Defective <br /> 2 . 01 Delivery of Bonds <br /> 1 . The word "defective," when modifying <br /> ' the word "Work," refers to Work that is A. When CONTRACTOR delivers the executed <br /> unsatisfactory, faulty, or deficient in that it does not Agreements to OWNER, CONTRACTOR shall also deliver <br /> conform to the Contract Documents or does not to OWNER such Bonds as CONTRACTOR may be <br /> meet the requirements of any inspection, reference required to furnish. <br /> standard, test, or approval referred to in the Contract <br /> Documents, or has been damaged prior to 2 .02 Copies of Documents <br /> ' ENGINEER's recommendation of final payment <br /> (unless responsibility for the protection thereof has A. OWNER shall furnish to CONTRACTOR up to <br /> been assumed by OWNER at Substantial ten copies of the Contract Documents . Additional copies <br /> ' Completion in accordance with paragraph 14.04 or will be famished upon request at the cost of reproduction. <br /> 14.05). <br /> 2 . 03 Commencement of Contract Times; Notice to <br /> Paragraphs D.1, 2 and 3 have been deleted and replaced Proceed <br /> ' by new paragraphs. See the Supplementary Conditions. <br /> D. Furnish, Install, Perform, Provide A. The Contract Times will commence to run on the <br /> thirtieth day after the Effective Date of the Agreement or, if <br /> i , The—weff-d. "fumish,—when- used in a Notice to Proceed is given, on the day indicated in the <br /> equipment, Notice to Proceed. A Notice to Proceed may be given at <br /> shag fnean to supply and deliver- said s any time within 30 days after the Effective <br /> Date of the <br /> Agreement. In no event will the Contract Times commence <br /> to run later than the sixtieth day after the day of Bid opening <br /> 00700 - 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.