Laserfiche WebLink
or the thirtieth day after the Effective Date of the Paragraph 2.05.0 has been deleted and replaced with -a - <br /> Agreement, whichever date is earlier. new paragraph. See the Supplementary Conditions. <br /> E. Hwidenee of 3fmuranee: nef re . . 117 1 t 4, <br /> 2. 04 Starting the Work Site is started, GO.1hRzRAGTQR and OWNER shall eae <br /> A. CONTRACTOR shall start to perform the Work identified i the Supple... en6 y Gendi , .+:a , f <br /> on the date when the Contract Times continence to run. No <br /> Work shall be done at the Site prior to the date on which the <br /> Contract Times commence to run. whieh CONTRACTOR and OWMBR r-espee&e1y tee <br /> ' 2 .05 Before Starting Construction Affiele T <br /> A. CONTRACTOR 's Review of Contract Documents: Paragraph 2.06.A has been deleted and replaced with a <br /> ' Before undertaking each part of the Work, new paragraph. See the Supplementary Conditions. <br /> CONTRACTOR shall carefully study and compare the 2 . 06 Preconstruction Conference <br /> Contract Documents and check and verify pertinent figures <br /> therein and all applicable field measurements. A. Within 20 days after the CV V'Oct 'Times s�� o <br /> CONTRACTOR shall promptly report in writing to mi% but be f "r,ixx oro "t the Site : "taFted c <br /> ..Y� ,..._ .... .�..., 4 .,tutu. <br /> ENGINEER any conflict, error, ambiguity, or discrepancy attended by GOA I A(;FQ x:NGP des,,-as <br /> which CONTRACTOR may discover and shall obtain a apprmepriate will be held to establish a ,veFkins <br /> written interpretation or clarification from ENGINEER under-standing ameng the paFfies as to the WeFk and <br /> to <br /> before proceeding with any Work - affected thereby; diseass the schedules re€effed to gmp 2.0;B, <br /> however, CONTRACTOR shall not be liable to OWNER pmeed»es €er handling Shop lfam*s and otherr <br /> or ENGINEER for failure to report any conflict, error, subm}t#als,preeessing—Appheatiensfer- -Paye=ent, and <br /> ambiguity, or discrepancy in the Contract Documents unless <br /> CONTRACTOR knew or reasonably should have known <br /> thereof. 2 .07 Initial Acceptance of Schedules <br /> B . Preliminary Schedules: Within ten days after the A. Unless otherwise provided in the Contract Docu- <br /> Effective Date of the Agreement (unless otherwise specified ments, at least ten days before submission of the first <br /> in the General Requirements), CONTRACTOR shall Application for Payment a conference attended by CON- <br /> submit to ENGINEER for its timely review: TRACTOR, ENGINEER, and others as appropriate will be <br /> held to review for acceptability to ENGINEER as provided <br /> 1 . a preliminary progress schedule indicat- below the schedules submitted in accordance with <br /> ing the times (numbers of days or dates) for starting paragraph 2.05 .B . CONTRACTOR shall have an <br /> and completing the various stages of the Work, additional ten days to make corrections and adjustments and <br /> including any Milestones specified in the Contract to complete and resubmit the schedules . No progress <br /> Documents; payment shall be made to CONTRACTOR until acceptable <br /> schedules are submitted to ENGINEER <br /> 2 , a preliminary schedule of Shop Drawing <br /> ' and Sample submittals which will list each required 1 . The progress schedule will be acceptable <br /> submittal and the times for submitting, reviewing, to ENGINEER if it provides an orderly progression <br /> and processing such submittal; and of the Work to completion within any specified <br /> Milestones and the Contract Times. Such accep- <br /> t 3 . a preliminary schedule of values for all of tance will not impose on ENGINEER responsibility <br /> the Work which includes quantities and prices of for the progress schedule, for sequencing, schedul- <br /> items which when added together equal the Contract ing, or progress of the Work nor interfere with or <br /> Price and subdivides the Work into component parts relieve CONTRACTOR from CONTRACTOR's <br /> in sufficient detail to serve as the basis for progress full responsibility therefor. <br /> payments during performance of the Work. Such <br /> ' prices will include an appropriate amount of 2. CONTRACTOR's schedule of Shop <br /> overhead and profit applicable to each item of Drawing and Sample submittals will be acceptable <br /> Work. to ENGINEER if it provides a workable <br /> arrangement for reviewing and processing the <br /> required submittals. <br /> 00700 - 10 <br />