Laserfiche WebLink
' contained herein may refer to other requirements or specifications (such as FDOT' s <br /> Standard Specifications for Road and Bridge Construction ) . If there is a conflict <br /> between the Specifications and any referenced specification or requirement , then <br /> the most stringent specification or requirement shall govern . In any event , the <br /> ENGINEER shall determine which specification or requirement governs , and the <br /> ' ENGINEER' s decision shall be final . <br /> F . Notify all permitting agencies of intention to begin construction . Give proper <br /> ' notification within the time frame required by the agency. <br /> G . Give the ENGINEER ten ( 10 ) days minimum notice before beginning work on the <br /> ' Project . <br /> H . Give the ENGINEER a minimum of 48 hours notice before performing any test . <br /> ' I . Before performing any work outside the designated limits of the work site , secure <br /> any necessary permits and authorization from the applicable owner, or verify in <br /> ' writing that such has been previously obtained . Follow all requirements of any said <br /> permits or authorization . Give the ENGINEER and appropriate owner ten ( 10 ) days <br /> minimum notice before commencing construction operations outside the designated <br /> limits of the work site . <br /> J . Do not work overtime unless authorized to do so by OWNER . If overtime is <br /> ' required , provide 48 hours minimum notice to the ENGINEER . <br /> K . Do not perform any work on holidays or weekends that requires inspection by the <br /> ' ENGINEER or OWNER , without first obtaining the OWNER' s written permission . <br /> L . Anything mentioned in the Specifications and not shown in the Drawings , or shown <br /> ' in the Drawings and not mentioned in the Specifications , shall be of like effect as if <br /> shown or mentioned in both . <br /> ' M . The items of work on this project are to proceed in the sequence listed in Section <br /> 01014 , " Maintenance of Operations " and shall be operable within the time frame <br /> ' stated from the date of the Notice to Proceed . Do not start any work that involves <br /> modification to existing facilities , until written approval and authorization has been <br /> received from the OWNER or his designated representative . After written approval <br /> ' and authorization has been received , give the OWNER a minimum of 48 hours <br /> advance notice before starting any work that involves modifications to existing <br /> facilities . <br /> ' + + END OF SECTION + + <br /> Last revised 7/6/01 01009=2 PROJECT <br /> ' FAEngineering\Capital Projects\0219-Kitching Station Trailhead\0219 Kitching-Contract Docs\0219-01009 - Special Provisions.doc <br />