Laserfiche WebLink
' SECTION 01010 <br /> SUMMARY OF WORK <br /> 1 . 1 GENERAL <br /> A. The summary of the Work described in this Section is an overall summary of the <br /> ' responsibilities of the CONTRACTOR and his relation to the OWNER . <br /> 1 . 2 LOCATION OF WORK <br /> ' 4 0 95t ' STREET NORTH COUNTY PARK <br /> A. The proposed work is located at 9 5 ( ) . <br /> SEBASTIAN , FL 32960 <br /> 1 . 3 WORK TO BE DONE <br /> ' A . Construct a replica train station , parking lot , and walking trail . <br /> [ Note to Preparers The above language is very job specific and has been provided as <br /> ' an example only] <br /> Be Furnish all the labor, materials , equipment , tools , plant , supervision , transportation , <br /> safety control , traffic control , services , incidentals , etc , to complete all of the work in <br /> a first-class workmanlike manner as required by the Contract Documents to the full <br /> and complete satisfaction of the Owner. All work shall be performed by craftsmen <br /> skilled in their trade . <br /> ' C . Work shall include all repairs , replacements and restoration required as a result of <br /> damages caused during the construction process . <br /> ' D . Furnish and install all materials , equipment and labor which are reasonably and <br /> properly inferable and necessary for the proper completion of the work , even though said <br /> materials , equipment and labor may not be specifically indicated in the Contract <br /> ' Documents . <br /> 1 . 4 CONTRACTS <br /> ' A . The Work shall be constructed under one prime contract. <br /> Last Revised 9/6101 01010- 1 PROJECT <br /> FAEngineering\Capital Projects\0219-Kitching Stadon Trailhead\0219 Kitching-Contract Docs\0219-01010 - Summary of Work.doc <br />