Laserfiche WebLink
' 1 . 5 PARTIAL UTILIZATION BY OWNER <br /> A. Conduct the Work to maintain existing facilities in operation at all times . <br /> 1 . 6 CONTRACTOR ' s USE OF PREMISES <br /> ' A . Secure a location for on-site storage of all material and equipment necessary for <br /> completion of this project . Submit the proposed location and storage layout to the <br /> ' OWNER/ENGINEER at the pre-construction conference for approval . <br /> Be Assume full responsibility for protection and safekeeping of products stored on or off <br /> premises . <br /> Co Move stored products that interfere with the operations of the OWNER . <br /> additional storage or work areas required . <br /> D . Obtain and pay for all a g q <br /> E . Provide and pay for Tabor, materials and equipment ; tools , construction equipment <br /> and machinery; water, heat and utilities required for construction ; and other facilities <br /> and services necessary for proper execution and completion of the work. <br /> F . Secure and pay for Government Fees and Licenses . <br /> G . Give required- notice to Agencies and to the public . Take particular care to <br /> adequately inform the public of scheduled temporary disruption of water, drainage , <br /> and/or sewer services . <br /> H . Comply .with codes , ordinances , rules , regulations , orders and other legal <br /> requirements of public authorities which bear on performance of the Work . <br /> I . Maintain traffic on all roads and streets , in compliance with the Contract Documents . <br /> + + END OF SECTION + + <br /> Last Revised 916101 01010-2 PROJECT <br /> FAEngineering\Capital Projects\0219-Kitching Station Trailhead\0219 Kitching-Contract Docs\0219-01010 - Summary of Work.doc <br />