My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-348.C
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-348.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2017 2:23:02 PM
Creation date
9/30/2015 7:10:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/16/2003
Control Number
2003-348.C
Agenda Item Number
11.I.4
Entity Name
Barth Construction
Subject
Contract and Specifications Kitching Station Trailhead
Area
North County Regional Park
Project Number
0219
Bid Number
5099
Archived Roll/Disk#
3208
Supplemental fields
SmeadsoftID
3566
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01014 <br /> MAINTENANCE OF OPERATIONS <br /> 1 . 1 GENERAL <br /> A . Schedule and perform the Work in a manner such that the OWNER can keep <br /> ' existing facilities in continuous dependable operation . <br /> Be Perform all construction necessary to complete connections and tie- ins/shutdowns <br /> to existing facilities . <br /> C . Keep existing facilities in operation unless otherwise specifically permitted in these <br /> specifications or approved in writing by the OWNER . <br /> 1 . 2 GENERAL CONSTRAINTS <br /> A . Furnish any temporary work, facilities , roads , walks , protection of existing structures , <br /> piping , blind flanges , valves , equipment , etc , that may be required to maintain <br /> continuous and dependable operation of existing systems , at no extra cost to the <br /> OWNER . <br /> Be Schedule the Work in such a manner so that all existing systems are maintained in <br /> continuous operation . All short-term system or partial system shutdowns shall be <br /> approved in writing by the OWNER . If, in the opinion of the ENGINEER , a <br /> shutdown is not required in order to perform the Work , utilize alternative methods to <br /> accomplish the Work. Schedule and coordinate all shutdowns at times suitable to <br /> the OWNER . Provide the OWNER with a minimum of 7 days notice of the need for <br /> any system shutdown . <br /> C . Required shutdowns shall not begin until all materials are on-hand , pre-assembled <br /> (as possible ) , and ready for installation . At a time approved by the OWNER , the <br /> shutdown period will commence and the CONTRACTOR shall proceed with the <br /> work continuously, start to finish. , until the work is completed and the system is <br /> tested , cleared for service , and ready for operation . If the CONTRACTOR <br /> completes all required work before the specified shutdown period has ended , the <br /> ' OWNER may immediately place the system back in service . <br /> D . The OWNER shall have the authority to order work stopped or prohibited which <br /> would , in its opinion , unreasonably result in stopping the necessary functions of the <br /> operations . <br /> Last revised : 7/6/01 01014- 1 PROJECT <br /> ' FAEngineering\Capital Projects\0219-Kitching Station Trailhead\0219 Kitching-Contract Docs\0219-01014 - Maintenance of <br /> Operations.doc <br />