Laserfiche WebLink
The above referenced standards were developed using F . H . W . A . , U . S . D . O .T. Manual _ _ <br /> on Uniform Traffic Control Devices ( MUTCD ) . <br /> D . ITEM NO . 102-3 . 2 TRAFFIC CONTROL DEVICES , WARNING DEVICES AND <br /> BARRIERS - INSTALLATION : The responsibility for installation and maintenance of <br /> ' adequate traffic control devices , warning devices and barriers , for the protection of the <br /> travel in public and workmen , as well as to safeguard the work area in general shall <br /> rest with the Contractor. Consideration shall be given to recommendations of the <br /> 1 Engineer. The required traffic control devices , warning devices and barriers shall be <br /> erected by the Contractor prior to creation of any hazardous condition and in <br /> conjunction with any necessary re- routing of traffic . The Contractor shall immediately <br /> ' remove , turn or cover any devices or barriers which do not apply to existing conditions . <br /> All traffic control devices shall conform to MUTCD standards and shall be clean and <br /> relatively undamaged . Damaged devices diminishing legibility and recognition , during <br /> ' either night or day conditions , are not acceptable for use . <br /> E . ITEM NO . 102-3 . 2 . 7 NO WAIVER OF LIABILITY : The Contractor shall conduct his <br /> ' operations in such a manner that no undue hazard will result due to the requirements <br /> of this article , and the procedures and policies described therein shall in no way act as <br /> a waiver of any of the terms of the liability of the Contractor or his. surety . <br /> ' Item of Payment <br /> ' Payment for the work specified in this item shall be made under: <br /> Bid Item No . 102 - Maintenance of Trafficen Lump Sum <br /> ITEM 103 an AS -BUILT DRAWINGS <br /> ' During the entire construction operation , the contractor shall maintain records of all deviations <br /> from the Drawings and Specifications and shall prepare therefrom Arecord@ drawings <br /> showing correctly and accurately all changes and deviations from the work , made during <br /> ' construction to reflect the work as it was actually constructed . The following items are <br /> required to be shown on County project record drawings : <br /> ' A. Right-of--Way Swale/Drainage - All culverts inverts ; inlet grate and bottom <br /> elevations ; swale beginning and end bottom elevations ; and highs and lows <br /> ' along top of bank . Size of swale . <br /> Be Roadway Drainage - All inverts , manhole top elevations , grate top <br /> elevations . <br /> C . Retention Ponds - Perimeter elevations , grade breaks , depths , and calculate <br /> pond area at control elevation and grade breaks above water surface . <br /> D . Roadway: <br /> ' 1 . 1 . Elevations of PVI at profile Grade Line ( PGL ) . <br /> 2 . 2 . Edge of pavement elevations at curb inlets . <br /> 3 . 3 . Install new roadway alignment control points upon final roadway <br /> Last revised 7/9/01 01025-4 PROJECT <br /> FAEngineering\Capital Projects\0219-Kitching Station Trailhead\0219 Kitching-Contract Docs\0219-01025 - Measurement and <br /> Payment.doc <br />