Laserfiche WebLink
completion . <br /> 4 . 4 . Include all intersections and side streets . Latitude , departure and - <br /> elevations for all control points . <br /> ' 5 . 5 . Stations and offsets , all structures . <br /> E . Building — finished floor. <br /> ' Record drawings shall conform to recognized standards of drafting , shall be neat and legible . <br /> County will supply Contractor with AutoCAD 14 drawings on compact disk or 3 . 5" floppy disks . <br /> Contractor will input As- Built information on drawings and return to County. Contractor=s <br /> ' surveyor will sign and sealed six (6 ) sets of record drawings . <br /> Item of Payment <br /> ' Payment for the work specified in this item shall be made under: <br /> Bid Item - As-Built Drawings - Lump Sum <br /> ITEM NOS . 104 = EROSION AND WATER POLLUTION CONTROL <br /> ' The Contractor shall install erosion and waterP ollution control methods in accordance with <br /> FDOT Index 100 , 102 , 103 and 104 , Standard Specifications Section 104 , and all permit <br /> ' requirements . The Contractor is responsible for meeting appropriate federal , state , and local <br /> regulations and water quality standards , such as turbidity . All disturbed areas will be <br /> replanted with approved vegetation cover (either final or temporary) within 30 days of final <br /> ' grading . <br /> A . Ditches , Streams and Canals : Staked and floating turbidity barriers shall be installed in <br /> all permanent watercourse in a manner so as not to act as a dam . Barriers shall be <br /> located at distance of no greater. than 25 feet downstream from the last point of <br /> construction . <br /> Be Silt Fences : Silt fences shall be installed to prevent silt and erosion from leaving the <br /> project limits particularly adjacent to wetlands , roadside ditches or existing bodies of <br /> ' water. <br /> ' C . Storm Sewer System : The Contractor shall protect the storm sewer system from <br /> erosion and sedimentation during construction . This may include the use of baled hay, <br /> silt fences and or any other method approved by the ENGINEER. All such costs <br /> ' associated with this shall be included in the unit cost of storm sewer system . Should <br /> any constructed item be damaged due to erosion or sedimentation , the Contractor <br /> shall repair or replace the item with no additional compensation . All new and existing <br /> ' (where called for) storm sewer pipes shall be clean and free from silt prior to final <br /> acceptance . <br /> ' D . The contractor shall maintain stormwater runoff during construction so that flooding <br /> does not occur. The Contractor shall coordinate the work with the County. <br /> 01025-5 PROJECT <br /> Last revised 7/9/01 <br /> RlEngineering\Capitai Projects\0219-Kitching Station Trailhead\0219 Kitching-Contract Docs\0219-01025 - Measurement and <br /> 1 Payment.doc <br />