Laserfiche WebLink
Item of Payment <br /> ' Payment for the work specified in this item shall be made under: <br /> Bid Item Nos . 100 , 102 , 103 & 104 - Erosion and Water Pollution - Lump Sum <br /> ITEM NO . 110 - CLEARING AND GRUBBING <br /> ' The work specified in this item shall conform to Section 110 of the Florida Department of <br /> Transportation Standard Specifications for Road and Bridge Construction . ( Latest Edition ) <br /> with the following modifications : <br /> ' A . Prior to any clearing and grubbing , the contractor will stake the right-of-way. <br /> Unimproved areas shall be cleared of trees , logs , stumps , brush , vegetation , rubbish <br /> ' and other perishable or objectionable matter within limits shown on the plans <br /> excepting for certain trees and shrubs shown on the plans or as directed by the <br /> Engineer which are to remain undisturbed and protected . Stumps and roots between <br /> slope stakes in cuts and in embankments 3 feet or less in depth shall be removed to a <br /> depth of 18 inches -below subgrade . No stumps , roots , or perishable matter of any <br /> description shall remain under concrete slabs or footing , including pavement and <br /> ' sidewalks . <br /> Be No trees shall be removed or relocated until the Engineer or his representative has <br /> marked all trees to be saved , after a review of the project site with the Contractor's <br /> representative . <br /> C . Where the final pavement or structural work will be close to existing trees , the <br /> Contractor shall exercise care in the vicinity of the trees . Further, the Contractor shall <br /> ' saw cut along the edge of the outside limits of the stabilization , structure subgrade or <br /> sidewalk to a minimum depth of 4 feet below the finish grade and paint with a <br /> commercial grade pruning paint the ends of all sawn roots . If directed by the Engineer <br /> or where shown on the drawings , work shall be done Aby hand@ in order to protect <br /> the trees . <br /> D . The Contractor shall exercise care when working in the vicinity of all trees to remain so <br /> as to not damage or remove major root structures . The Contractor shall not pull hair <br /> or major root structures . All severed roots shall be sawn clean and paint with pruning <br /> ' paint. Stumps , roots , etc . , shall be completely removed and disposed of by the <br /> Contractor. Undesirable , dead , and/or damaged trees (as so designated by the <br /> Engineer) shall be removed . <br /> 1 E . All trees to be removed shall be disposed off site ; burning will be strictly prohibited . <br /> F . All trees or shrubs which are to remain shall be preserved and protected by the <br /> Contractor. Where the removal of valuable trees or shrubs specifically for <br /> transplanting is required , this work shall be done in cooperation with the Owner and at <br /> Last revised 7/9/01 01025-6 PROJECT <br /> FAEngineering\Capital Projects\0219-Kitching Station Trailhead\0219 Kitching-Contract Docs\0219-01025 - Measurement and <br /> Payment.doc <br />