My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-348.C
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-348.C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2017 2:23:02 PM
Creation date
9/30/2015 7:10:56 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/16/2003
Control Number
2003-348.C
Agenda Item Number
11.I.4
Entity Name
Barth Construction
Subject
Contract and Specifications Kitching Station Trailhead
Area
North County Regional Park
Project Number
0219
Bid Number
5099
Archived Roll/Disk#
3208
Supplemental fields
SmeadsoftID
3566
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' no additional expense to the Owner. <br /> G . All items to be removed shall be excavated to their full depth . All culverts removed <br /> ' from residential driveway entrances within the right-of--way shall become the property <br /> of the respective homeowner. Those homeowners not desiring the culverts may <br /> donate them to the County free of charge . ( See Paragraph 9 , Special Provisions ) <br /> ' The County shall transport the culverts to the County's storage yard . All metal <br /> castings for catch basins , manholes , or other structures shall be carefully removed <br /> and stored in the County's Storage Yard if they are deemed salvageable by the <br /> Engineer. The excavated materials shall be removed from the job site and disposed in <br /> a location designated or approved by the Owner. Where required , suitable material as <br /> approved by the Engineer shall then be backfilled and compacted to restore the <br /> ' original contour of the ground . The fill material shall be backfilled and compacted in <br /> accordance with Section 120 of these specifications . <br /> ' H . No additional payment will be made , nor will additional work , or change orders be <br /> authorized for work needed to remove , relocate , protect , or otherwise account for in <br /> the construction of the work depicted in the plans , for any feature , or item that would <br /> ' be apparent from a careful inspection of the site and review of the plans , even though <br /> such feature or item is not specifically called out in the plans . It is therefore essential <br /> the contractor make such inspection and review . <br /> ' I . The unitP rice bid for this item shall include the cost of all labor, tools , and equipment <br /> necessary to excavate , remove , and dispose of those items as directed by the <br /> ' Engineer and where designated on the Drawings . The cost of restoration and backfill <br /> and compaction for the specific area of removal shall also be included under this item . <br /> rItem of Payment <br /> Payment for the work specified in this item shall be made under: <br /> Bid Item 110 - Clearing and Grubbing - Lump Sum <br /> The provisions of Special Provisions , Paragraph 9 shall be applicable and the costs thereof <br /> ' included under this item . <br /> ' ITEM NO . 120 - GRADING <br /> ' The work specified in this item shall conform to Section 120 of the Florida Department of <br /> Transportation Specifications for Road and Bridge Construction . ( Latest Edition ) . Excess fill <br /> removed to be delivered to Indian River County to a site designated bythe County Engineer. <br /> ' This item shall include all excavation of whatever kind , including subsoil , if necessary , for the <br /> roadway, drainage channels , removal of existing pavement, structures and any other work <br /> ' normally included in Section 120-7 . Also included is all work necessary to construct all <br /> necessary embankments , including compaction of same , normally included in Section 120-8 <br /> and 102-9 . Grading of swales and the construction of all earthwork necessary to achieve the <br /> Last revised 7/9/01 01025-7 PROJECT <br /> RIEngineering\capital Projects\0219-Kitching Station Trailhead\0219 Kitching-Contract Docs\0219-01025 - Measurement and <br /> ' Payment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.