My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-089
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2016 11:22:20 AM
Creation date
9/30/2015 10:39:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
03/13/2007
Control Number
2007-089
Agenda Item Number
7.K.
Entity Name
Beach Preservation Applied Technology and Management
Subject
Work Order No.5 Services Agreement
Beach Preservation Plan
Area
Sector 7
Supplemental fields
SmeadsoftID
6209
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If needed, ATM will request an permit extension for the placement of the sand from May 1st to <br /> May 15`". The request will require continuous coordination with all agencies. <br /> Upon the contractor's completion of the project to the satisfaction of the ATM , ATM will provide <br /> the County and regulatory agencies project certification per permit requirements . <br /> ATM will provide the County updates via e-mail of any significant conversations or e-mail <br /> exchanges with the regulatory agencies, and will be billed on a time and materials basis. At <br /> ATM 's discretion, Coastal Eco-Group may be consulted on a time and materials basis. ATM will <br /> also provide the County, DEP and USACE with project certification. <br /> Task 3 Sediment Sampling and Reporting <br /> Per permit requirements, sand samples need to be collected and analyzed. Sand samples (two <br /> repetitive) need to be collected at two cross-shore locations at each Y monument station (e.g. , <br /> R-971 R-97.51 R-98, etc.) upon the County's acceptance of the pay section. The samples will be <br /> collected by ATM staff as part of site visit (Task 1 ) . ATM will be in close coordination with <br /> County staff in the regarding the collection of the samples. Collected samples will be provided <br /> to and analyzed to ASTM standards by a qualified lab (SEA) . <br /> ATM will provide the necessary regulatory agencies and the County with the laboratory analysis <br /> of the sand samples. <br /> Task 4 Shorebird Monitoring <br /> ATM will provide monitoring of nesting and non-breeding (limited to FL breeding species) <br /> shorebirds per permit requirements. The monitoring effort will be conducted under the <br /> supervision of a FWC-approved shorebird monitor. ATM will responsible for the monitoring and <br /> data reporting, but will include County staff. In preparation for the monitoring County staff will <br /> mark the location of each DEP '% monument station (e .g. , R-97 , R-97.5, R-98, etc.) . Prior to <br /> April 1 ", The FWC-approved ATM biologist- in-charge will train the monitoring staff (1 ATM field <br /> biologist and 1 County staff) . The budget is based on County staff, once trained) conducting 13 <br /> days of monitoring. The shorebird monitoring will commence April 1 ". During the 1S, week of <br /> monitoring the will provide up to 7 days of direct supervision of the shorebird monitoring <br /> personnel. After April 7`", the shorebird monitoring will be conducted by one of the personnel , <br /> and will be conducted under the direction of FWC-approved ATM biologist-in-charge. Shorebird <br /> monitoring will continue though May 15`" unless construction is completed prior to May 15`" <br /> The shorebird monitoring will be performed in the morning , and direction will be given to the <br /> dredge contractor as early as possible. <br /> ATM will provide weekly reporting to the regulatory agency as required by FWC protocol. The <br /> County will provide a dedicated ATV for this effort. <br />
The URL can be used to link to this page
Your browser does not support the video tag.