Laserfiche WebLink
DRAFT SCOPE OF WORK <br /> Indian River County Beach Preservation Project <br /> Sectors 1 & 2 Post-Construction Services <br /> Sectors 1 & 2 Response to Permit Modification RAI <br /> Sector 7 Pre -Construction Services <br /> Introduction <br /> Sectors 1 &2 <br /> The Indian River County Sectors 1 & 2 Beach Renourishment project is located along <br /> the shoreline south of Sebastian Inlet , at Sebastian Inlet State Park and unincorporated <br /> Ambersand Beach and extends between FDEP reference monuments R-3 . 5 and R- 17 . <br /> The beach was initially nourished in the winter of 2002/2003 . Hurricanes Frances and <br /> Jeanne in the summer of 2004 caused severe erosion of the beach and replacement of <br /> material lost due to the storms is planned for the winter of 2005/2006 to ensure <br /> continued protection of the beach/dune habitat and upland infrastructure . <br /> The proposed project involves replacing the sediment lost during the hurricanes along <br /> the 2 . 5 mile shoreline. The project would use sand dredged from the sand trap within <br /> Sebastian Inlet and an offshore borrow site . The total construction volume is <br /> approximately 290 , 000 cubic yards over the 13 , 300 feet of beach . This project will not <br /> impact the nearshore hard bottom and thus , no mitigation is proposed . <br /> In addition , this scope of work details the development of the Sectors 1 &2 2"d Year Post- <br /> Construction Physical Monitoring Report as required by FDEP Permit No . 0166929-001 - <br /> JC . Data collection for this report was authorized by the County under Contract <br /> Amendment No . 6 . This data will be collected in June 2005 . <br /> Sector 7 <br /> The Indian River County Sector 7 Beach Renourishment project is located along the <br /> South County shoreline and extends between FDEP reference monuments R-97 and R- <br /> 108 . The proposed beach nourishment design includes the placement of a total beachfill <br /> volume of approximately 363, 600 cy , which includes the placement of 36 ,400 cy of sand <br /> for the dune enhancement feature . Construction of this project is anticipated in the <br /> winter of 2005/2006 (concurrent with the Sectors 1 & 2 project) . <br /> Task 1 = Sectors 1 &2 Permit Modification Response to FDEP <br /> Request for Additional Information <br /> Based on the requested permit modification for Sectors 1 &2 , the FDEP staff has raised a <br /> number of questions and issues regarding the project. These were provided to the <br /> County in terms of a 2nd Request for Additional Information (RAI) on June 10 , 2005 . <br /> ATM will review the RAI comments with County staff and prepare a response . The RAI <br /> specifically required the development of construction plans , analysis of the sediment in <br /> CADockenents and Settings4onathangUcal Settings\Temporary Internet Files\OMEWmendment 13 scopeAcc 1 <br />