Laserfiche WebLink
the sand trap and a compatibility analysis of this material with the existing beach , and <br /> additional classification of the nearshore hardbottom . <br /> TASK 1 . 1 : PROJECT DESIGN AND ANALYSIS <br /> Design cross-sections will be developed based on the final project volume approved by <br /> FDEP using the most recent profile survey available . Design profiles will be developed <br /> to restore the beach to the 2004 pre-hurricane condition and will avoid direct and <br /> secondary coverage of nearshore hardbottom resources. <br /> Post-hurricane survey data were collected in October 2004 to wading depths and full <br /> profile survey data will be collected in June 2005 as part of the Sectors 1 &2 2"d year <br /> post-construction physical monitoring . All profile data are only collected at DEP <br /> reference monuments. <br /> Upon finalization of the design , permit sketches will be developed and the design will be <br /> overlaid on the most recent aerial images for submittal to FDEP . <br /> TASK 1 . 2 : BORROW AREA DESIGN <br /> ATM will develop a dredge cut plan for the Sebastian Inlet sand trap that addresses the <br /> need for beach compatible sand while limiting the potential for rock within the dredged <br /> material . This analysis will be based on existing geotechnical data for the sand trap <br /> including recent bathymetry, seismic data and core borings. The task will result in a <br /> dredge cut plan with specific horizontal and depth boundaries and rock buffer areas <br /> where appropriate . The volume of recoverable sand within these cuts will be calculated . <br /> Drawings of the borrow cut plan will be developed with sufficient detail for project <br /> permitting and bidding . <br /> TASK 1 . 3: CONTRACT DOCUMENT PREPARATION <br /> Task 1 . 3.1 Contract Drawings <br /> Planform drawings will be prepared at 1 " 200' and will serve as the basis for the <br /> contract drawings in the final package sent to prospective bidders. Construction <br /> drawings shall include the following features overlaid on the aerial photography images: <br /> • The design of the beach project including construction berms and toe of fill <br /> locations , and the location of the dune to be constructed ; <br /> • Construction access and equipment/materials staging ; <br /> • Existing FDEP survey reference monument locations and state plane coordinate <br /> values; and , <br /> • Roads and other identifiable upland features as deemed appropriate. <br /> • Borrow Area location and dredge depths . <br /> Additional sheets will include the Project Title Sheet and location bathymetry . A draft <br /> submittal will be provided to the County for review and comment. ATM shall revise <br /> submittals promptly and shall fumish a master set of 100% drawings for County approval <br /> prior to reproduction of copies suitable for distribution to prospective bidders . <br /> CADoaanents and SeWngsyonathangLLocel Settings\Temporary Intemet Fi1esk0LK2EV4nendment 13 scopexbc 2 <br />