My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-015
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 11:51:44 AM
Creation date
9/30/2015 6:15:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
01/21/2003
Control Number
2003-015
Agenda Item Number
11.G.1.
Entity Name
Applied Technology and Management, Inc.
Subject
Beach preservation plan-Amendment #5 to Engineering design & permitting
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
2801
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
It is assumed that construction will require twelve weeks of continuous work. ATM <br /> Engineers will, on a weekly basis and coinciding with the date of the progress meeting, <br /> document construction and work and access areas with site photography; said <br /> photography shall be recorded in digital format and shall be made available to COUNTY <br /> within two business days of acquisition, for COUNTY records. Further for the purposes <br /> of scope, budget and ATM responsibility, this Amendment allows one ATM Senior <br /> Coastal Engineer to conduct site observations/inspections for not more than six 'on-call' <br /> days for the duration of the construction. ATM will send two engineers on-site for up to <br /> six of the twelve weekly meetings for added quality assurance. This additional staff <br /> involvement is envisioned to be necessary during the first three and the last three weeks <br /> of construction to ensure full compliance with the contract documents and to deal with <br /> additional CONTRACTOR issues that typically arise during these milestones. <br /> The ATM Engineer(s), when present on-site, shall not undertake any responsibilities of the <br /> CONTRACTOR or Subcontractors or their representatives nor shall he/she assume <br /> control over any aspect of the means, methods, techniques, sequences or procedures on <br /> construction unless such directions are specifically required in the Contract Documents <br /> nor shall he/she advise or assume control over any safety precautions and programs in <br /> connection with the work. <br /> Task 9.2—Pre-Construction Conference <br /> ATM will prepare for and participate with the COUNTY and CONTRACTOR in two (2) Pre- <br /> Construction Conferences (prior to CONTRACTOR mobilization to the Ambersand Project <br /> site) in order to address questions regarding the interpretation of the project plans and <br /> specifications. The first such meeting will be strictly between the COUNTY, <br /> CONTRACTOR, and ATM. The second meeting will include these parties as well as <br /> representatives of state regulatory agencies and the marine turtle permit holder <br /> responsible for early season daily monitoring during construction. ATM will be <br /> responsible for preparing the agenda and chairing the meetings, and preparing and <br /> distributing minutes to attendees following the meeting. <br /> Task 9.3—Weekly Construction Progress Meetinas <br /> ATM shall attend and conduct weekly progress meetings with the COUNTY and <br /> CONTRACTOR during construction (it is assumed that construction will require 12 <br /> weeks of continuous work). ATM will be responsible for preparing the agenda and <br /> chairing the meetings, and preparing and distributing minutes to attendees following the <br /> meeting. <br /> CAWINDOWSWEMPMM IRC Construction Phase Services-Ambersend Project Jan 14 2003 rev 11403 545pm.doo <br />
The URL can be used to link to this page
Your browser does not support the video tag.