My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-015
CBCC
>
Official Documents
>
2000's
>
2003
>
2003-015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 11:51:44 AM
Creation date
9/30/2015 6:15:39 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
01/21/2003
Control Number
2003-015
Agenda Item Number
11.G.1.
Entity Name
Applied Technology and Management, Inc.
Subject
Beach preservation plan-Amendment #5 to Engineering design & permitting
Archived Roll/Disk#
3160
Supplemental fields
SmeadsoftID
2801
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task 9.6—Production of As-Built Drawings <br /> ATM will provide the COUNTY with As-Built drawings based on the post-construction <br /> survey to be provided by the CONTRACTOR (profile surveys of the acceptance <br /> sections for pay will not be accepted as post-construction surveys). The As-Built <br /> set shall consist of updated construction drawings showing the post-construction survey <br /> of the beach renourishment area and the post-dredge survey of the borrow area (both <br /> surveys to be provided by the CONTRACTOR). The As-Built drawings will be furnished <br /> as two hard copies (24" x 36") to the COUNTY and one hard copy to the FDEP Bureau <br /> of Beaches and Wetland Resources. <br /> Task 9.7—Turtle Monitoring <br /> As specified by the FDEP Permit (No. 0166929-001-JC), specific measures regarding <br /> the protection of sea turtles during construction are required. These activities shall be <br /> conducted by persons with prior experience and training in such activities and who are <br /> duly authorized to conduct such activities through a valid permit issued by the Fish and <br /> Wildlife Conservation Commission. <br /> Daily monitoring and reporting shall occur from March 1, 2003 and continue through May <br /> 1, 2003. <br /> Task 9.7.1: Pre-Construction Coordination Meeting <br /> One pre-construction coordination meeting will occur between ATM and the sub- <br /> contractor at the project site in order to review the requirements of Turtle Monitoring. <br /> ATM will provide the agenda and shall preside over the coordination meeting. It is <br /> assumed that this effort will be coincident/concurrent with the formal Pre-Construction <br /> Conference between COUNTY, CONTRACTOR, ATM & state regulatory agency staff. <br /> Task 9.7.2: Daily Nesting Surveys <br /> A daily marine turtle nest survey of the nesting beach in the vicinity of the project shall <br /> be performed starting March 1st 2003 and continue until May 1st 2003 during <br /> construction. Observations of nests or activity shall be reported and nests within the <br /> project area shall be relocated and marked per Task 9.6.4. As specked by FDEP Permit <br /> (No. 0166929-001-JC), Specific Condition Number 13(b) the nests shall be deposited <br /> within areas where construction activities have ceased or will not occur for 65 days, shall <br /> be marked and left in place unless other factors threaten the success of the nest. <br /> Task 9.7.3: Nest Relocation and Marking <br /> In the event that marine turtle nests are identified within the construction area, such <br /> nests shall be relocated. These nests (20 loggerhead nests and one leatherback nest <br /> are assumed to require this action, for budgeting purposes) will be relocated prior to 9 <br /> a.m. in the morning. These nests will be marked as specified in the FDEP Permit (No. <br /> 0166929-001-JC). <br /> CAWINDOWSITEMPIATM IRC Construction Phase Services-Ambersand Project Jan 14 2003 rev 11403 545pm.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.