Laserfiche WebLink
DIVISION 1 — GENERAL REQUIREMENTS <br />Section IA - Scope of Work <br />The project consists of furnishing all labor, materials, equipment, and services necessary to raise existing <br />footbridge, as shown on the drawings and described in these specifications. Scope includes, but not <br />limited to the following: <br />• Stabilize and regrade site at ends of footbridge. <br />• Remove existing railing, decking, stringers and crossbeams. <br />• Raise cross beams a minimum of 3'-4" measured from their original position. <br />• Reinstall cross beams, stringers and decking. <br />• Install new railing supports and new railing. <br />• Set horizontal members with crown edge up. <br />• Do not cut or notch structural members. <br />Section 1B - Photographs <br />CONTRACTOR shall take photographs of all work areas prior to construction and all unusual <br />conditions during construction. <br />Section 1 C - Permits <br />The OWNER has applied for the Indian River County Building Department Permit and paid for <br />applicable fees. The CONTRACTOR shall show proof of required, insurance and pull permit from <br />the County Building Department. <br />Section 1D - Protection of Public <br />CONTRACTOR shall erect and maintain sufficient safeguards around all excavations, <br />embankments or obstructions to protect the public from work area hazards. <br />Page 14 of 41 <br />