My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-115
CBCC
>
Official Documents
>
2000's
>
2006
>
2006-115
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/26/2016 4:31:26 PM
Creation date
9/30/2015 9:38:09 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
04/04/2006
Control Number
2006-115
Agenda Item Number
11. I. 2.
Entity Name
Herman Summerlin,Sr./Summerlin Seven Seas
Subject
Bid award for Round Island Park Footbridge
Bid Number
7057
Supplemental fields
SmeadsoftID
5581
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIVISION 2 - SITE WORK <br />Section 2A — Clearing & Grubbing <br />Work Included: <br />a. Clear and grub site at ends of footbridge. <br />2. Specification reference: <br />The work specified in this Section shall conform to Section 110 of the Florida Department of <br />Transportation standard Specifications for Road and Bridge Construction, latest edition <br />except as modified herein. <br />Execution: <br />a. Trim back trees and brush from construction area except trees and brush designated to <br />remain. Grub all stumps, brush and roots from site except areas to remain undisturbed. <br />b. Remove from site all debris resulting from demolition and removal operation as it <br />accumulates. <br />c. Backfill holes resulting from clearing operations. <br />d. Grade areas affected by clearing and grubbing and leave level maintaining grades and <br />contours of site. <br />e. Demolished materials shall not be used as backfill in holes or in any other areas within site. <br />Cleared materials shall be disposed of by Contractor at his own expense. <br />f Provide, erect and maintain barriers, lights and other devices as required to protect general <br />public, workers and adjoining property in accordance with General Conditions. <br />g. Cost of all work under this Section shall be included in the lump sum price for clearing and <br />grubbing. <br />Section 2B — Earthwork <br />1. Work Included: <br />a. Site grading <br />b. Excavation and backfill <br />2. Specification Reference: <br />The work specified in this section shall conform to Section 120 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction, latest edition, <br />except as modified herein. <br />3. Bring finished grade to a smooth and compact surface, ready to receive <br />footbridge, fishing pier and observation. <br />4. The cost of all earthwork shall be included in the lump sum price for <br />footbridge, construction. <br />Page 15 of 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.