Laserfiche WebLink
DIVISION 2 - SITE WORK <br />Section 2A — Clearing & Grubbing <br />Work Included: <br />a. Clear and grub site at ends of footbridge. <br />2. Specification reference: <br />The work specified in this Section shall conform to Section 110 of the Florida Department of <br />Transportation standard Specifications for Road and Bridge Construction, latest edition <br />except as modified herein. <br />Execution: <br />a. Trim back trees and brush from construction area except trees and brush designated to <br />remain. Grub all stumps, brush and roots from site except areas to remain undisturbed. <br />b. Remove from site all debris resulting from demolition and removal operation as it <br />accumulates. <br />c. Backfill holes resulting from clearing operations. <br />d. Grade areas affected by clearing and grubbing and leave level maintaining grades and <br />contours of site. <br />e. Demolished materials shall not be used as backfill in holes or in any other areas within site. <br />Cleared materials shall be disposed of by Contractor at his own expense. <br />f Provide, erect and maintain barriers, lights and other devices as required to protect general <br />public, workers and adjoining property in accordance with General Conditions. <br />g. Cost of all work under this Section shall be included in the lump sum price for clearing and <br />grubbing. <br />Section 2B — Earthwork <br />1. Work Included: <br />a. Site grading <br />b. Excavation and backfill <br />2. Specification Reference: <br />The work specified in this section shall conform to Section 120 of the Florida Department of <br />Transportation Standard Specifications for Road and Bridge Construction, latest edition, <br />except as modified herein. <br />3. Bring finished grade to a smooth and compact surface, ready to receive <br />footbridge, fishing pier and observation. <br />4. The cost of all earthwork shall be included in the lump sum price for <br />footbridge, construction. <br />Page 15 of 41 <br />