1.04 <br />1.05 <br />1.06 <br />PRELIMINARY PROCEDURES <br />A. <br />C] <br />Owner or Engineer may initiate changes by submitting a proposal <br />Request to Contractor. Request will include the following: <br />1. Detailed description of the Change, Products, and location of the <br />change in the Project. <br />2. Supplementary or revised Drawings and Specifications. <br />3. The projected time span for making the change, and a specific <br />statement as to whether overtime work is, or is not, authorized. <br />4. A specific period of time during which the requested price will be <br />considered valid. <br />5. Such request is for information only, and is not an instruction to <br />execute the changes, nor to stop work in progress. <br />Contractor may initiate changes by submitting a written notice to <br />Engineer, containing: <br />1. Description of the proposed changes <br />2. Statement of the reason for making the changes. <br />3. Statement of the effect on the Contract Sum and the Contract <br />Time. <br />4. Statement of the effect on the work of separate contractors. <br />5. Documentation supporting any changes in Contract Sum or <br />Contract Time, as appropriate. <br />CONSTRUCTION CHANGE AUTHORIZATION <br />A. In lieu of Proposal Request, Engineer may issue a "Work Directive <br />Change' for Contractor to proceed with a change for subsequent <br />inclusion in a Change Order. <br />B. Authorization will describe changes in the work, both additions and <br />deletions, with attachments of revised Contract Documents to define <br />details of the change. <br />C. Owner and Engineer will sign and date the Work Directive Change as <br />authorization for the Contractor to proceed with the Changes. <br />DOCUMENTATION OF PROPOSALS AND CLAIMS <br />A. Support each quotation for a lump sum proposal, and for each unit price <br />which has not previously been established, with sufficient substantiating <br />data to allow Engineer to evaluate the quotation. <br />B. On request, provide additional data to support time and cost computation <br />including the following: <br />1. Labor required. <br />2. Equipment required. <br />01153-2 <br />01153 Change Order Procedures.doc <br />J %07-02912 Inch WM - Vero take EstateslDocumentslRepodsV idding Contract Specifications\01153 Change Order Procedures doc <br />