Laserfiche WebLink
SECTION 01311 <br /> CONSTRUCTION SCHEDULES <br /> PART 1 -- GENERAL <br /> 1 .01 REQUIREMENTS INCLUDED <br /> A. Promptly after award of the Contract, Contractor shall prepare and <br /> submit to the Engineer estimated construction progress for the <br /> Work, with sub-schedules of related activities which are essential <br /> to its progress . <br /> B . Coordinate the work and scheduling with and around other <br /> contractors and individual trades performing work on the Project. <br /> C . Submit revised progress schedules with each application for <br /> payment. <br /> D . Progress Schedule shall become part of Contract Documents after <br /> approval by Engineer . <br /> 1 . 02 RELATED REQUIREMENTS <br /> A. In other parts of the Contract Documents : <br /> 1 . General Conditions : <br /> a . Articles 2 and 6 — Schedules , Reports , and <br /> Records <br /> b . Sections 6. 1 and 6. 2 — Supervision by Contractor <br /> C. Article 15 — Supervision of Work , Termination , and <br /> Delay <br /> B . Specified in other sections : <br /> 1 . Section 01000 : Summary of Work <br /> 2 . Section 01201 : Preconstruction Conference <br /> 3. Section 01340 : Shop Drawings , Product Data , and <br /> Samples <br /> 1 . 03 FORM OF SCHEDULES <br /> A . Prepare schedules in the form of a horizontal bar chart as follows : <br /> 1 . Provide separate horizontal bar for each trade or operation <br /> 2 . Horizontal time scale : Identify the first work day of each <br /> week . <br /> 01311 Construction ScheduIes.doc <br /> 01311 - 1 <br /> J 107-02912 Inch WM - Vero lake EstatesDocumentslReponslBiddiN Contract Specifications101311 Constmdion Schedules.doc <br />