My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-403
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 1:06:00 PM
Creation date
9/30/2015 11:28:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/20/2007
Control Number
2007-403
Agenda Item Number
11.J.2
Entity Name
Sheltra and Sons Construction
Subject
Master Planned Water Transmission Main
Area
Vero Lakes Estates
Project Number
UCP 2958
Bid Number
2008015
Supplemental fields
SmeadsoftID
6699
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 . Scale and spacing : To allow space for notations and <br /> future revisions . <br /> 4 . Minimum sheet size : 11 " x 17" <br /> B . Format of listings : The chronological order of the start of each <br /> item of work . <br /> C . Identification of listings : By major specification section numbers . <br /> 1 . 04 CONTENT OF SCHEDULES <br /> A . Construction Progress Schedule shall : <br /> 1 . Show the complete sequence of construction by activity. <br /> 2 . Show the dates for the beginning and completion of each <br /> major element of construction ; specifically list: <br /> a . Subcontractor work <br /> b . Utility construction <br /> C . Restoration <br /> 3 . Show projected percentage of completion for each item , as <br /> of the first day of each month . <br /> 1 .05 PROGRESS REVISIONS <br /> A. Indicate progress of each activity to date of submission <br /> B . Show changes occurring since previous submission of Schedule : <br /> 1 . Major changes in scope. <br /> 2 . Activities modified since previous submission . <br /> 3 . Revised projections of progress and completion . <br /> 4 . Other identifiable changes . <br /> C . Provide a narrative report as needed to define : <br /> 1 . Problem areas , anticipated delays, and the impact on the <br /> schedule . <br /> 2 . Corrective action recommended , and its effect. <br /> 3 . The effect of changes on schedules of other prime <br /> contractors . <br /> 1 . 06 SUBMISSIONS <br /> A. Submit initial schedules within ten ( 10) days after award of <br /> Contract ; Engineer will review schedules for information only. <br /> B . Submit revised progress schedules with each application for <br /> payment. <br /> 01311 Construction Schedules.doc <br /> 01311 - 2 <br /> J:\0]-02912 lnch WM - Vera Lake Estates\Documents\ReporlsTidding Contract Specifcations101311 Constmclion Schedulesacc <br />
The URL can be used to link to this page
Your browser does not support the video tag.