Laserfiche WebLink
1.06 MANUFACTURER'S CERTIFICATES <br />A. Submit Certificates, in duplicate, in accordance with requirements <br />of each specification section. <br />1.07 CONTRACTOR RESPONSIBILITIES <br />A. Review Shop Drawings, Product Data and samples prior to <br />submission. <br />B. Determine and verify: <br />1. Field measurements <br />2. Field construction criteria <br />3. Catalog numbers and similar data <br />4. Conformance with specifications <br />C. Coordinate each submittal with requirements of the work and of <br />the Contract Documents. <br />D. Notify the Engineer in writing at the time of submission of ANY <br />AND ALL DEVIATIONS in the submittals from requirements of the <br />Contract Documents. All of the Contractor's comments and <br />notations shall be in red ink. <br />E. Begin no fabrication of work which requires submittals until return <br />of submittals with Engineer's approval. <br />1.08 SUBMISSION REQUIREMENTS <br />A. Make submittals promptly in accordance with approved schedule, <br />and in such sequence as to cause no delay in the work of any <br />other Contractor. <br />B. Number of submittals required: <br />1. Shop Drawings: Submit the number of opaque <br />reproductions which the contractor requires, plus four (4) <br />copies which will be retained by the Engineer. <br />2. Product Data: Submit the number of copies which the <br />Contractor requires, plus four (4) which will be retained by <br />the Engineer. <br />3. Samples: Submit the number stated in each specification <br />section. <br />C. Submittals shall contain <br />1. The date of submission and the dates of any previous <br />submissions. <br />2. The project title and number <br />01340 Shop Drawings, Product Data and Samples.doc <br />01340-3 <br />J107-029 121nch WM - Vem Lake Estates\Documents\Reportslaidding contract SpecifwtionsVW Shop Drawings, Product Data and Samples doc <br />