My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-403
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 1:06:00 PM
Creation date
9/30/2015 11:28:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/20/2007
Control Number
2007-403
Agenda Item Number
11.J.2
Entity Name
Sheltra and Sons Construction
Subject
Master Planned Water Transmission Main
Area
Vero Lakes Estates
Project Number
UCP 2958
Bid Number
2008015
Supplemental fields
SmeadsoftID
6699
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . 06 MANUFACTURER'S CERTIFICATES <br /> A. Submit Certificates , in duplicate , in accordance with requirements <br /> of each specification section . <br /> 1 . 07 CONTRACTOR RESPONSIBILITIES <br /> A. Review Shop Drawings, Product Data and samples prior to <br /> submission . <br /> B . Determine and verify: <br /> 1 . Field measurements <br /> 2 . Field construction criteria <br /> 3 . Catalog numbers and similar data <br /> 4 . Conformance with specifications <br /> C . Coordinate each submittal with requirements of the work and of <br /> the Contract Documents . <br /> D . Notify the Engineer in writing at the time of submission of ANY <br /> AND ALL DEVIATIONS in the submittals from requirements of the <br /> Contract Documents . All of the Contractor's comments and <br /> notations shall be in red ink . <br /> E . Begin no fabrication of work which requires submittals until return <br /> of submittals with Engineer' s approval . <br /> 1 .08 SUBMISSION REQUIREMENTS <br /> A . Make submittals promptly in accordance with approved schedule , <br /> and in such sequence as to cause no delay in the work of any <br /> other Contractor. <br /> B . Number of submittals required : <br /> 1 . Shop Drawings : Submit the number of opaque <br /> reproductions which the contractor requires , plus four (4) <br /> copies which will be retained by the Engineer. <br /> 2 . Product Data : Submit the number of copies which the <br /> Contractor requires , plus four (4 ) which will be retained by <br /> the Engineer. <br /> 3 . Samples : Submit the number stated in each specification <br /> section . <br /> C . Submittals shall contain : <br /> 1 . The date of submission and the dates of any previous <br /> submissions. <br /> 2 . The project title and number <br /> 01340 Shop Drawings, Product Data and Samples.doc <br /> 01340 - 3 <br /> J107-029 121nch WM - Vem Lake Estates\Documents\Reporislaidding contract SpecifwtionsVW Shop Drawings, Product Data and Samples doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.