Laserfiche WebLink
3. Contract identification <br />4. The name of: <br />a. Contractor <br />b. Supplier <br />G. Manufacturer <br />5. Identification of the project, with specification section <br />1.09 RESUBMISSION REQUIREMENTS <br />A. Make any corrections or changes in the submittals required by the <br />Engineer and resubmit until approved. <br />B. Shop Drawings and Product Data: <br />1. Revise initial drawings or data, and resubmit as specified <br />for initial submittal. <br />2. Indicate any changes which have been made other than <br />those requested by the Engineer. <br />C. Samples: Submit new samples as required for initial submittal. <br />1.10 DISTRIBUTION <br />A. Distribute reproductions of Shop Drawings and copies of Product <br />Data which carry the Engineer's stamp or review to: <br />1. Job site file. <br />2. Record Documents file. <br />3. Other affected contractors <br />4. Subcontractors <br />5. Supplier or fabricator <br />B. Distribute samples which carry the Engineer's stamp of approval <br />as directed by the Engineer. <br />01340 Shop Drawings, Product Data and Samples.doc <br />01340-4 <br />J \07-02912 1nch W M -Vero Lake EstateMDacuments%Repor s\Bidding Contract Speclfcahors%01340 Shop Drawings, Product Data and Samples.doc <br />number. <br />6. <br />Field dimensions, clearly identified as such. <br />7. <br />Relation to adjacent or critical features of the Work or <br />materials. <br />8. <br />Applicable standards, such as ASTM or Federal <br />Specification numbers. <br />9. <br />Identification of deviations from Contract Documents <br />10. <br />Identification of revisions on resubmittals. <br />11. <br />An 8" x 3" blank space for Contractor and Engineer stamps <br />12. <br />Contractor's stamp or review and approval, initialed or <br />signed, certifying to review of initialed or signed, certifying <br />to review of submittal, verification of products, field <br />measurements and field construction criteria, and <br />coordination of the information within the submittal with <br />requirements of the work and of Contract Documents. <br />1.09 RESUBMISSION REQUIREMENTS <br />A. Make any corrections or changes in the submittals required by the <br />Engineer and resubmit until approved. <br />B. Shop Drawings and Product Data: <br />1. Revise initial drawings or data, and resubmit as specified <br />for initial submittal. <br />2. Indicate any changes which have been made other than <br />those requested by the Engineer. <br />C. Samples: Submit new samples as required for initial submittal. <br />1.10 DISTRIBUTION <br />A. Distribute reproductions of Shop Drawings and copies of Product <br />Data which carry the Engineer's stamp or review to: <br />1. Job site file. <br />2. Record Documents file. <br />3. Other affected contractors <br />4. Subcontractors <br />5. Supplier or fabricator <br />B. Distribute samples which carry the Engineer's stamp of approval <br />as directed by the Engineer. <br />01340 Shop Drawings, Product Data and Samples.doc <br />01340-4 <br />J \07-02912 1nch W M -Vero Lake EstateMDacuments%Repor s\Bidding Contract Speclfcahors%01340 Shop Drawings, Product Data and Samples.doc <br />