Laserfiche WebLink
SECTION 01560 <br />TEMPORARY CONTROLS <br />PART 1 -- GENERAL <br />1.01 REQUIREMENTS INCLUDED <br />A. Furnish, install, and maintain temporary control facilities required <br />for construction; remove on completion of entire project any <br />features not intended to remain on the project site. <br />B. Provide <br />noise control, dust control, <br />water control, <br />debris control, <br />pollution <br />control and erosion control <br />as specified in <br />the appropriate <br />sections <br />of these documents. <br />1.02 REQUIREMENTS OF REGULATORY AGENCIES <br />A. Comply with federal, state, and local codes and regulations and <br />utility company requirements. <br />B. Comply with Department of Transportation requirements. <br />PART 2 -- PRODUCTS <br />2.01 MATERIALS (GENERAL) <br />A. Materials may be new or used, but must be adequate in capacity <br />and quality for the required usage, MUST NOT create unsafe <br />conditions and MUST NOT violate requirements of applicable <br />codes and standards. <br />2.02 TEMPORARY NOISE CONTROL <br />A. Mechanical equipment shall be fitted with mufflers to reduce noise <br />from internal combustion type engines. <br />B. Bells, sirens, alarms, etc., shall be adjusted to provide adequate <br />warnings to personnel on the project site; however, they shall be <br />regulated to an intensity that is amenable to the neighboring <br />communities. <br />C. Exterior construction work noises shall be kept to a minimum <br />during evening, night, and early morning hours. In addition, <br />weekend and holiday noises shall be limited to acceptable levels. <br />D. In addition to on-site control, noise considerations shall be made <br />to off-site vehicles and equipment (mobilization, demobilization, <br />deliveries, etc.). <br />01560 Temporary Controls.doc <br />01560- 1 <br />JW -029 12 Inch W M -Vero Lake Estates\pocumenUoReports\Bidding Contract SpecifiwtionsW 1566 Temporary Contmis.doc <br />