My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-403
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 1:06:00 PM
Creation date
9/30/2015 11:28:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/20/2007
Control Number
2007-403
Agenda Item Number
11.J.2
Entity Name
Sheltra and Sons Construction
Subject
Master Planned Water Transmission Main
Area
Vero Lakes Estates
Project Number
UCP 2958
Bid Number
2008015
Supplemental fields
SmeadsoftID
6699
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D . When project is alteration and additional work , DO NOT use <br /> materials and equipment removed from existing structure , except <br /> as specifically allowed by notation or indication by Contract <br /> Documents . <br /> 1 . 04 WORKMANSHIP <br /> A. Comply with industry standards except when more restrictive <br /> tolerances or specified requirements indicate more rigid standards <br /> or more precise workmanship . <br /> B . Perform work by persons qualified to produce workmanship of <br /> specified quality. <br /> C . Secure products in place with positive anchorage devises <br /> designed and sized to withstand stresses , vibration , and rocking . <br /> 1 .05 MANUFACTURER' S INSTRUCTIONS <br /> A . When work is specified to comply with manufacturer's printed <br /> instructions , obtain and distribute copies to persons involved , and <br /> maintain one set at job site in field office . <br /> B . Perform work in accordance with manufacturer' s instructions and <br /> specified requirements . <br /> C . Should a conflict exist between Specifications and manufacturer's <br /> instructions , consult with Engineer. <br /> 1 .06 TRANSPORTATION AND HANDLING <br /> A. Arrange deliveries of products in accordance with construction <br /> schedules; coordinate to avoid delay of progress, conflict with <br /> work and with conditions at the site . <br /> B . Transport products by methods to avoid product damage ; deliver <br /> in undamaged condition in manufacturer' s unopened containers or <br /> packaging , dry. <br /> C . Provide equipment and personnel to handle product by methods <br /> to prevent soiling or damage . <br /> D . Promptly inspect shipments to assure that products comply with <br /> requirements , quantities are correct and products are undamaged . <br /> 01600 Material and Equipment.doc <br /> 01600 - 2 <br /> J :/07-029 Vero Lake Estates — 12' W.M .J:\07-029 12 Inch WM - Vero Lake Estates\Documents\Reports\Bidding Contract <br /> Specifications\01600 Material and Equipment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.