My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-403
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 1:06:00 PM
Creation date
9/30/2015 11:28:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/20/2007
Control Number
2007-403
Agenda Item Number
11.J.2
Entity Name
Sheltra and Sons Construction
Subject
Master Planned Water Transmission Main
Area
Vero Lakes Estates
Project Number
UCP 2958
Bid Number
2008015
Supplemental fields
SmeadsoftID
6699
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 . 07 STORAGE AND PROTECTION <br /> A. Store products in accordance with manufacturer' s instructions , <br /> with seals and labels intact and legible . <br /> B . Store sensitive products in weather-tight enclosures ; maintain <br /> within temperatures and humidity ranges recommended/required <br /> by manufacturer' s instructions . <br /> C . For exterior storage of fabricated products , place on sloped <br /> supports above ground . Cover products subject to deterioration <br /> with impervious sheet covering ; provide ventilation to avoid <br /> condensation . <br /> D . Store loose granular materials on solid surfaces in a well -drained <br /> area ; prevent mixing with foreign matter. <br /> E . Arrange storage to provide access for inspection . Periodically <br /> inspect to assure products are undamaged , and are maintained <br /> under required conditions . <br /> F . After installation , provide coverings to protect products from <br /> damage from traffic and construction operations , remove when no <br /> longer needed . <br /> 1 . 08 PRODUCT OPTIONS <br /> A. Within 30 days after date of Contract , submit complete list of <br /> major products proposed , with name of manufacturer, trade name <br /> and model . <br /> B . Options : <br /> 1 . Products specified only be reference standard : Any <br /> product meeting that standard . <br /> 2 . Product specified by naming several manufacturers : <br /> Product of any named manufacturer meeting <br /> specifications . <br /> 3 . Products specified by naming one or more manufacturers <br /> and "or equal' : Submit a request for substitution for any <br /> manufacturer not specifically named . <br /> 1 .09 SUBSTITUTIONS <br /> A. Only within 30 days after date of Contract will Engineer consider <br /> requests from Contractor for substitutions . Subsequently , <br /> substitutions will be considered only when a product becomes <br /> unavailable due to no fault of the Contractor. <br /> 01600 Material and Equipment.doc <br /> 01600 - 3 <br /> J :/07-029 Vero Lake Estates — 12' W.M.J:\07-029 12 Inch WM - Vero Lake Estates\Documents\Reports\Bidding Contract <br /> Specifcations101600 Material and Equipment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.