My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-403
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 1:06:00 PM
Creation date
9/30/2015 11:28:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/20/2007
Control Number
2007-403
Agenda Item Number
11.J.2
Entity Name
Sheltra and Sons Construction
Subject
Master Planned Water Transmission Main
Area
Vero Lakes Estates
Project Number
UCP 2958
Bid Number
2008015
Supplemental fields
SmeadsoftID
6699
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B . Document each request with complete data , drawings and <br /> samples as appropriate , substantiating compliance of proposed <br /> substitution with Contract Documents including : <br /> 1 . Comparison of the qualities of the proposed substitution <br /> with the specified . <br /> 2 . Changes required in other elements of the work because <br /> of the substitution . <br /> 3 . Effect on the construction schedule . <br /> 4 . Cost data comparing the proposed substitution with the <br /> product specified . <br /> 5 . Any required license fees or royalties <br /> 6 . Availability of maintenance service , and the source <br /> replacement materials . <br /> C . Request constitutes a representation that Contractor: <br /> 1 . Has investigated proposed product and determined that it <br /> meets or exceeds , in all respects , specified product. <br /> 2 . Will provide the same warranty for substitution as for <br /> specified product. <br /> 3 . Will coordinate installation and make other changes which <br /> may be required for work to be complete in all respects . <br /> 4 . Waives claims for additional costs which may subsequently <br /> become apparent. <br /> D . Substitutions will not be considered when they are indicated or <br /> implied on Shop Drawing or Product Data submittals without <br /> separate written request, or when acceptance will require <br /> substantial revision of Contract Documents . <br /> E . Engineer will review to determine acceptability of proposed <br /> substitution , and will notify Contractor of acceptance or rejection in <br /> writing within a reasonable time . <br /> PART2 -- PRODUCTS <br /> Not applicable <br /> PART 3 -- EXECUTION <br /> Not applicable <br /> ** END OF SECTION ** <br /> 01600 Material and Equipment.doc <br /> 01600 - 4 <br /> J :/07-029 Vero Lake Estates — 12" W.M .J:\07-029 12 Inch WM - Vero Lake Estates\Documents\Reports\Bidding Contract <br /> Specifications101600 Material and Equipment.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.