My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-403
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 1:06:00 PM
Creation date
9/30/2015 11:28:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/20/2007
Control Number
2007-403
Agenda Item Number
11.J.2
Entity Name
Sheltra and Sons Construction
Subject
Master Planned Water Transmission Main
Area
Vero Lakes Estates
Project Number
UCP 2958
Bid Number
2008015
Supplemental fields
SmeadsoftID
6699
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01710 <br /> CLEANING <br /> PART 1 -- GENERAL <br /> 1 .01 REQUIREMENTS INCLUDED <br /> Execute cleaning , during progress of the work, and at completion of the work , as <br /> required by General conditions . <br /> 1 . 02 DISPOSAL REQUIREMENTS <br /> Conduct cleaning and disposal operations to comply with codes , ordinances , <br /> regulations , and anti- pollution laws . <br /> PART 2 -- PRODUCTS <br /> 2.01 MATERIALS <br /> A. Use only those cleaning materials which will not create hazards to health <br /> or property and which will not damage finishes and surfaces. <br /> B . Use only those cleaning materials and methods recommended by <br /> manufacturer of the surface material to be cleaned . <br /> C . Use cleaning materials only on surfaces recommended by cleaning <br /> material manufacturer. <br /> PART 3 -- EXECUTION <br /> 3. 01 DURING CONSTRUCTION <br /> A. Execute periodic cleaning to keep the work , the site , and adjacent <br /> properties free from accumulation of waste materials , rubbish , and <br /> windblown debris resulting from construction operations . <br /> B . Dispose of waste materials, cartons , crating , debris , and rubbish at <br /> designated waste receptacles . <br /> C . Contractor shall maintain a broom-cleaned site during the entire <br /> construction phase . <br /> D . For exterior utility work (such as underground pipelines , roadways, <br /> service areas , etc . ) , these shall be cleaned daily . Not less frequently than <br /> once weekly. Roadways shall be mechanically broomed . <br /> 01710 Cleaning. doc <br /> 01710 - 1 <br /> JM7-02912 Inch WM - Vero Lake Estates\Documents\Repons\eiddin9 Contract SpecificationsT1710 Cleaning.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.