My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-403
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 1:06:00 PM
Creation date
9/30/2015 11:28:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/20/2007
Control Number
2007-403
Agenda Item Number
11.J.2
Entity Name
Sheltra and Sons Construction
Subject
Master Planned Water Transmission Main
Area
Vero Lakes Estates
Project Number
UCP 2958
Bid Number
2008015
Supplemental fields
SmeadsoftID
6699
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 . 02 DUST CONTROL <br /> A. General Contractor shall broom-clean interior spaces prior to the start of <br /> completing painting and continue cleaning on an as-needed basis until <br /> painting is finished . <br /> B . Schedule operations so that dust and other contaminants resulting from <br /> the cleaning process will not fall on wet or newly-coated surfaces . <br /> 3.03 FINAL CLEANING <br /> A . Remove grease, mastic, adhesives , dust, dirt, stains , fingerprints , labels , <br /> and other foreign materials . <br /> B . Contractor shall broom-clean paved surface; rake-clean other surfaces of <br /> the grounds . <br /> C . Prior to final completion , Contractor shall conduct an inspection of all <br /> work areas to verify that the entire work area is clean . <br /> ** END OF SECTION ** <br /> 01710 Cleaning .doc <br /> 01710 - 2 <br /> Ja07-02912 Inch W M - Vero Lake Estates\Documents\Reports\ebtling Contract Spec cations\01710 CIeaning.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.