Laserfiche WebLink
SECTION 02576 <br /> PAVEMENT, SIDEWALK, AND DRIVEWAY REPLACEMENT <br /> PART 1 -- GENERAL <br /> 1 .01 REFERENCES <br /> A. Section numbers and Article numbers specified are those contained in the <br /> latest edition of the "Florida Department of Transportation Standard <br /> Specifications for Road and Bridge Construction ." <br /> B. Indian River County Code Chapter 312, Section 08 C . Utility Construction in <br /> Right-of-Way shall control where applicable . It is intended that the other <br /> specifications contained herein are to be applied as more specific. In the <br /> event of a conflict between a provision of Code Section 312 .08 C and any <br /> other provision of these specifications the more restrictive provision shall <br /> apply . <br /> C . 312 .08 C . Utility construction within the right-of-way. All utility work will <br /> require a right-of-way construction permit. Utility companies having a valid <br /> franchise to operate in Indian River County will not be required to pay a right- <br /> of-way permit fee . Utility companies not having a valid franchise may be <br /> required to pay a user fee to be determined by the director of public works . <br /> The permit application shall be submitted along with the following <br /> information . <br /> 1 . General application data and specific utility data . <br /> 2 . Appropriate filing fee . <br /> 3 . Three (3) sets of Engineering plans which contain plan , profile and <br /> cross-section views of the existing and proposed facilities including <br /> all existing utilities , structures in the right-of-way within one hundred <br /> ( 100) feet of the improvement, and other pertinent information . <br /> 4. Plans that show that the following criteria are met: <br /> a . Utility placement shall be the proper depth and location as <br /> approved by the Public Works Director and Utilities Director. <br /> b . All utility structures including traffic signal and control <br /> appurtenances, drainage structures , communication , and <br /> electrical lines, gas lines , water, sewer, oil transmission lines, <br /> etc. , shall meet specifications and construction procedures <br /> as required by Florida Department of Transportation and <br /> appropriate utility agencies . <br /> C. Open pavement cut shall not be permitted on County arterial <br /> and collector routes as designated on the County's <br /> thoroughfare plan unless approved by the Public Works <br /> Director on the permit. All such crossings shall be "bore and <br /> jack" or "directional drill" in accordance with Florida <br /> Department of Transportation standards, unless approved <br /> open cut. If open cut is approved , one ( 1 ) lane of traffic in <br /> each direction should be maintained , using proper traffic <br /> 02576 Pavement, Sidewalk, and Driveway Replacement.doc <br /> 02576 - 1 <br /> J9W-02912 Inch WM - Vero Lake Estates%DccumeNSWewdslBidding Contract Specifcatbos102576 Pavement, Sidewalk, and Driveway Replacementdoc <br />