My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-403
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 1:06:00 PM
Creation date
9/30/2015 11:28:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/20/2007
Control Number
2007-403
Agenda Item Number
11.J.2
Entity Name
Sheltra and Sons Construction
Subject
Master Planned Water Transmission Main
Area
Vero Lakes Estates
Project Number
UCP 2958
Bid Number
2008015
Supplemental fields
SmeadsoftID
6699
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
control procedures as outlined in the reference material cited <br /> in section 312 .08 . 1 (b) and (c) . <br /> d . Pavement cut and restoration , where approved , shall be as <br /> follows : <br /> 1 . Pipe bedding , backfill and compaction shall conform <br /> to standards specified in section 312 .08 . 1 (a) and (c). <br /> Open cut restoration shall meet specifications <br /> detailed in drawing No. 6 section 312. 19. Density <br /> testing shall be performed by an approved <br /> independent testing laboratory and reports submitted <br /> to the Public Works Director prior to permanent <br /> patch . A temporary asphalt patch shall be applied <br /> within twenty-four (24) hours after backfill and <br /> compaction . The finish surface of the temporary <br /> asphalt patch shall be within one-quarter ( 1 /4 ) inch of <br /> the elevation of the existing roadway surface. <br /> 2 . Seventy-two (72) hours prior to the time of pavement <br /> cut, the Public Works Director shall be notified of the <br /> date and time of the cut. An emergency phone <br /> number of the Contractor shall be provided . <br /> 3 . Work site traffic control shall be provided in <br /> conformance with "Florida Department of <br /> Transportation Roadway and Traffic Design <br /> Standards." <br /> 4 . Asphalt restoration will be required within fifteen ( 15) <br /> days after temporary patch is installed . The final <br /> finish shall be smooth and uniform within a one- <br /> quarter ( 1 /4) inch tolerance of the required surface. <br /> 5 . Shoulder, right-of-way sodding , and other restoration <br /> shall be performed as required by the Public Works <br /> Director in accordance with Florida Department of <br /> Transportation Standards. <br /> 6. Traffic control devices (e .g . signs , street name signs, <br /> traffic signals and pavement markings) shall be <br /> restored to their original condition or better. <br /> 7 . Prior to final release of the performance bond , which <br /> shall occur no sooner than ninety (90) days after final <br /> pavement restoration , the Engineer-of-record or utility <br /> company shall request a final inspection, shall certify <br /> that the utility has been installed in accordance with <br /> standards specified in the publications listed in <br /> section 312 .08 , shall submit two (2) copies of as-built <br /> drawings, and shall submit release of lien by <br /> Contractors. <br /> 8 . All utility structures will be required to have an <br /> identification tag designating proper ownership . <br /> 02576 Pavement, Sidewalk, and Driveway Replacement.doc <br /> 02576 - 2 <br /> J9D7-029 12 Inch WM - Vero Lake Estates\Documents%Repodstaiddinq contract Specifcations102576 Pavement, Sidewalk, and Driveway Replacemencdoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.