control procedures as outlined in the reference material cited <br /> in section 312 .08 . 1 (b) and (c) . <br /> d . Pavement cut and restoration , where approved , shall be as <br /> follows : <br /> 1 . Pipe bedding , backfill and compaction shall conform <br /> to standards specified in section 312 .08 . 1 (a) and (c). <br /> Open cut restoration shall meet specifications <br /> detailed in drawing No. 6 section 312. 19. Density <br /> testing shall be performed by an approved <br /> independent testing laboratory and reports submitted <br /> to the Public Works Director prior to permanent <br /> patch . A temporary asphalt patch shall be applied <br /> within twenty-four (24) hours after backfill and <br /> compaction . The finish surface of the temporary <br /> asphalt patch shall be within one-quarter ( 1 /4 ) inch of <br /> the elevation of the existing roadway surface. <br /> 2 . Seventy-two (72) hours prior to the time of pavement <br /> cut, the Public Works Director shall be notified of the <br /> date and time of the cut. An emergency phone <br /> number of the Contractor shall be provided . <br /> 3 . Work site traffic control shall be provided in <br /> conformance with "Florida Department of <br /> Transportation Roadway and Traffic Design <br /> Standards." <br /> 4 . Asphalt restoration will be required within fifteen ( 15) <br /> days after temporary patch is installed . The final <br /> finish shall be smooth and uniform within a one- <br /> quarter ( 1 /4) inch tolerance of the required surface. <br /> 5 . Shoulder, right-of-way sodding , and other restoration <br /> shall be performed as required by the Public Works <br /> Director in accordance with Florida Department of <br /> Transportation Standards. <br /> 6. Traffic control devices (e .g . signs , street name signs, <br /> traffic signals and pavement markings) shall be <br /> restored to their original condition or better. <br /> 7 . Prior to final release of the performance bond , which <br /> shall occur no sooner than ninety (90) days after final <br /> pavement restoration , the Engineer-of-record or utility <br /> company shall request a final inspection, shall certify <br /> that the utility has been installed in accordance with <br /> standards specified in the publications listed in <br /> section 312 .08 , shall submit two (2) copies of as-built <br /> drawings, and shall submit release of lien by <br /> Contractors. <br /> 8 . All utility structures will be required to have an <br /> identification tag designating proper ownership . <br /> 02576 Pavement, Sidewalk, and Driveway Replacement.doc <br /> 02576 - 2 <br /> J9D7-029 12 Inch WM - Vero Lake Estates\Documents%Repodstaiddinq contract Specifcations102576 Pavement, Sidewalk, and Driveway Replacemencdoc <br />