My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-403
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/28/2016 1:06:00 PM
Creation date
9/30/2015 11:28:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/20/2007
Control Number
2007-403
Agenda Item Number
11.J.2
Entity Name
Sheltra and Sons Construction
Subject
Master Planned Water Transmission Main
Area
Vero Lakes Estates
Project Number
UCP 2958
Bid Number
2008015
Supplemental fields
SmeadsoftID
6699
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 .02 RESTORATION <br /> All surfaces , as described , shall be completed as soon as is reasonable . In no case <br /> shall the pavement or driveway replacement operation be unfinished for more than <br /> 10 days after backfilling unless otherwise directed by the Engineer. Replace all <br /> damaged or cut pavement due to Contractor's operations; restore all pavement <br /> outside of trench area that is damaged by the Contract at no expense to Owner. <br /> 1 . 03 GUARANTEE <br /> All restored areas within the public right-of-way shall be guaranteed for one year. In <br /> the event of settlement of paved areas more than one-quarter inch below the <br /> undisturbed adjacent permanent pavement, the Contractor shall make the <br /> necessary repairs to restore the pavement level within ten calendar days after <br /> notification by the Owner. The cost of such repairs shall be paid by the Contractor. <br /> PART 2 -- PRODUCTS <br /> 2.01 BASEROCK <br /> Limerock , shellrock, and local rock shall conform to FDOT specifications, Section <br /> 911 . <br /> 2 .02 ASPHALTIC CONCRETE <br /> A. Prime and Tack Coats: Prime and tack coats shall be applied to the <br /> prepared baserock. Prime coat shall be cutback asphalt, Grade RC-70 , MC- <br /> 30 , or MC-70, complying with FDOT Specifications , Articles 300- 1 through <br /> 300-7, applied at the average rate of 0 . 15 gallons per square yard . <br /> Tack coat shall be emulsified asphalt, Grade RS-2 , complying with FDOT <br /> Specifications , Articles 300- 1 through 300-7 respectively, applied at the <br /> average rate of 0 . 10 gallons per square yard . The bituminous quantities are <br /> considered as average and are subject to some variation at the discretion of <br /> the Engineer and at no additional cost. <br /> B. Plant Mix Wearing Surface: A plant mix wearing surface course shall be <br /> constructed on the prepared limerock base . Materials and construction shall <br /> conform with the requirements of FDOT Standard Specifications for Type S- <br /> 1 or S-3 (per drawing) Asphaltic Concrete, Section 331 , and Articles 331 -1 <br /> through 331 -4 . The finished pavement replacement shall be smooth and <br /> even with , or slightly above, the existing abutting pavement, but shall not <br /> have any appreciable bump due to this slight elevation . <br /> C . Rock, Gravel , or Marl Replacement: Roads, streets , or driveways <br /> constructed of rock, gravel , or marl shall be restored to a condition equal to <br /> or better than prior to construction using the same material unless directed <br /> otherwise . <br /> 02576 Pavement, Sidewalk, and Driveway Replacement.doc <br /> 02576 - 3 <br /> Ji07-02912 Inch W M - Vero Lake Estatesl0ocumentsGeIP:v1MBidcm9 contract SpecificatlonsW2576 Pavement, Sidewalk, and Driveway Replacement.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.