My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-403
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2025 10:04:57 AM
Creation date
9/30/2015 11:28:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/20/2007
Control Number
2007-403
Agenda Item Number
11.J.2
Entity Name
Sheltra and Sons Construction
Subject
Master Planned Water Transmission Main
Area
Vero Lakes Estates
Project Number
UCP 2958
Bid Number
2008015
Supplemental fields
SmeadsoftID
6699
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL CONDITIONS <br />ARTICLE 1 - DEFINITIONS AND TERMINOLOGY <br />1.01 Defined Terms <br />A. Wherever used in the Contract Documents and <br />printed with initial or all capital letters, the terms listed below will <br />have the meanings indicated which are applicable to both the <br />singular and plural thereof. <br />1. Addenda—Written or graphic instruments issued <br />prior to the opening of Bids which clarify, correct, or change the <br />Bidding Requirements or the Contract Documents. <br />2. Agreement --The written instrument which is <br />evidence of the agreement between OWNER and <br />CONTRACTOR covering the Work. <br />3. Application for Payment --The form acceptable to <br />ENGINEER which is to be used by CONTRACTOR during the <br />course of the Work in requesting progress or final payments and <br />which is to be accompanied by such supporting documentation <br />as is required by the Contract Documents. <br />4. Asbestos --Any material that contains more than <br />one percent asbestos and is friable or is releasing asbestos <br />fibers into the air above current action levels established by the <br />United States Occupational Safety and Health Administration. <br />5. Bid—The offer or proposal of a bidder submitted <br />on the prescribed form setting forth the prices for the Work to be <br />performed. <br />6. Bidding Documents --The Bidding Requirements <br />and the proposed Contract Documents (including all Addenda <br />issued prior to receipt of Bids). <br />7. Bidding Requirements—The Advertisement or <br />Invitation to Bid, Instructions to Bidders, Bid security form, if any, <br />and the Bid form with any supplements. <br />8. Bonds --Performance and payment bonds and <br />other instruments of security. <br />9. Change Order—A document recommended by <br />ENGINEER which is signed by CONTRACTOR and OWNER <br />and authorizes an addition, deletion, or revision in the Work or <br />an adjustment in the Contract Price or the Contract Times, <br />issued on or after the Effective Date of the Agreement. <br />10. Claim—A demand or assertion by OWNER or <br />CONTRACTOR seeking an adjustment of Contract Price or <br />Contract Times, or both, or other relief with respect to the terms <br />of the Contract. A demand for money or services by a third <br />party is not a Claim. <br />11. Contract—The entire and integrated written <br />agreement between the OWNER and CONTRACTOR <br />concerning the Work. The Contract supersedes prior <br />negotiations, representations, or agreements, whether written or <br />oral. <br />12. Contract Documents—The Contract Documents <br />establish the rights and obligations of the parties and include <br />the Agreement, Addenda (which pertain to the Contract Docu- <br />ments), CONTRACTOR's Bid (including documentation <br />accompanying the Bid and any post Bid documentation <br />submitted prior to the Notice of Award) when attached as an <br />exhibit to the Agreement, the Notice to Proceed, the Bonds, <br />these General Conditions, the Supplementary Conditions, the <br />Specifications and the Drawings as the same are more <br />specifically identified in the Agreement, together with all Written <br />Amendments, Change Orders, Work Change Directives, Field <br />Orders, and ENGINEER's written interpretations and <br />clarifications issued on or after the Effective Date of the Agree- <br />ment. Approved Shop Drawings and the reports and drawings <br />of subsurface and physical conditions are not Contract <br />Documents. Only printed or hard copies of the items listed in <br />this paragraph are Contract Documents. Files in electronic <br />media format of text, data, graphics, and the like that may be <br />furnished by OWNER to CONTRACTOR are not Contract <br />Documents. <br />13. Contract Price --The moneys payable by OWNER <br />to CONTRACTOR for completion of the Work in accordance <br />with the Contract Documents as stated in the Agreement <br />(subject to the provisions of paragraph 11.03 in the case of Unit <br />Price Work), <br />14. Contract Times --The number of days or the <br />dates stated in the Agreement to: (i) achieve Substantial <br />Completion; and (ii) complete the Work so that it is ready for <br />final payment as evidenced by ENGINEER's written <br />recommendation of final payment. <br />15. CONTRACTOR—The individual or entity with <br />whom OWNER has entered into the Agreement. <br />16. Cost of the Work --See paragraph 11.01.A for <br />definition. <br />17. Drawings—That part of the Contract Documents <br />prepared or approved by ENGINEER which graphically shows <br />the scope, extent, and character of the Work to be performed by <br />CONTRACTOR. Shop Drawings and other CONTRACTOR <br />submittals are not Drawings as so defined. <br />18. Effective Date of the Agreement --The date <br />indicated in the Agreement on which it becomes effective, but if <br />no such date is indicated, it means the date on which the <br />Agreement is signed and delivered by the last of the two parties <br />to sign and deliver. <br />19. ENGINEER --The individual or entity named as <br />such in the Agreement. <br />20. ENGINEER's Consultant --An individual or entity <br />having a contract with ENGINEER to furnish services as <br />ENGINEER's independent professional associate or consultant <br />with respect to the Project and who is identified as such in the <br />Supplementary Conditions. <br />00700 General Conditions (E]CDC).doc <br />00700-5 <br />1?07-029 121nch W M - Vem rake Estate DocumentsV eponsSidding Contma SpmlficatiowW700 Gmad Conditions (EICDC).doc <br />21. <br />Field Order—A <br />written <br />order issued <br />by <br />ENGI- <br />NEER <br />which <br />requires minor <br />changes <br />in the Work <br />but <br />which <br />00700 General Conditions (E]CDC).doc <br />00700-5 <br />1?07-029 121nch W M - Vem rake Estate DocumentsV eponsSidding Contma SpmlficatiowW700 Gmad Conditions (EICDC).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.