Laserfiche WebLink
B. Removal of Debris During Performance of the Work: <br />During the progress of the Work CONTRACTOR shall keep the <br />Site and other areas free from accumulations of waste <br />materials, rubbish, and other debris. Removal and disposal of <br />such waste materials, rubbish, and other debris shall conform to <br />applicable Laws and Regulations. <br />C. Cleaning: Prior to Substantial Completion of the Work <br />CONTRACTOR shall clean the Site and make it ready for <br />utilization by OWNER. At the completion of the Work CON- <br />TRACTOR shall remove from the Site all tools, appliances, <br />construction equipment and machinery, and surplus materials <br />and shall restore to original condition all property not designated <br />for alteration by the Contract Documents. <br />D. Loading Structures: CONTRACTOR shall not load <br />nor permit any part of any structure to be loaded in any manner <br />that will endanger the structure, nor shall CONTRACTOR <br />subject any part of the Work or adjacent property to stresses or <br />pressures that will endanger it. <br />6.12 Record Documents <br />A. CONTRACTOR shall maintain in a safe place at the <br />Site one record copy of all Drawings, Specifications, Addenda, <br />Written Amendments, Change Orders, Work Change <br />Directives, Field Orders, and written interpretations and <br />clarifications in good order and annotated to show changes <br />made during construction. These record documents together <br />with all approved Samples and a counterpart of all approved <br />Shop Drawings will be available to ENGINEER for reference. <br />Upon completion of the Work, these record documents, <br />Samples, and Shop Drawings will be delivered to ENGINEER <br />for OWNER. <br />6.13 Safety and Protection <br />A. CONTRACTOR shall be solely responsible for <br />initiating, maintaining and supervising all safety precautions and <br />programs in connection with the Work. CONTRACTOR shall <br />take all necessary precautions for the safety of, and shall <br />provide the necessary protection to prevent damage, injury or <br />loss to: <br />1.all persons on the Site or who may be affected <br />by the Work; <br />2.all the Work and materials and equipment to be <br />incorporated therein, whether in storage on or off the <br />Site; and <br />3.other property at the Site or adjacent thereto, <br />including trees, shrubs, lawns, walks, pavements, <br />roadways, structures, utilities, and Underground Facili- <br />ties not designated for removal, relocation, or <br />replacement in the course of construction. <br />B. CONTRACTOR shall comply with all applicable Laws <br />and Regulations relating to the safety of persons or property, or <br />to the protection of persons or property from damage, injury, or <br />loss; and shall erect and maintain all necessary safeguards for <br />such safety and protection. CONTRACTOR shall notify owners <br />of adjacent property and of Underground Facilities and other <br />utility owners when prosecution of the Work may affect them, <br />and shall cooperate with them in the protection, removal, <br />relocation, and replacement of their property. All damage, <br />injury, or loss to any property referred to in paragraph 6.13.A.2 <br />or 6.13.A.3 caused, directly or indirectly, in whole or in part, by <br />CONTRACTOR, any Subcontractor, Supplier, or any other <br />individual or entity directly or indirectly employed by any of them <br />to perform any of the Work, or anyone for whose acts any of <br />them may be liable, shall be remedied by CONTRACTOR <br />(except damage or loss attributable to the fault of Drawings or <br />Specifications or to the acts or omissions of OWNER or <br />ENGINEER or ENGINEER's Consultant, or anyone employed <br />by any of them, or anyone for whose acts any of them may be <br />liable, and not attributable, directly or indirectly, in whole or in <br />part, to the fault or negligence of CONTRACTOR or any <br />Subcontractor, Supplier, or other individual or entity directly or <br />indirectly employed by any of them). CONTRACTOR's duties <br />and responsibilities for safety and for protection of the Work <br />shall continue until such time as all the Work is completed and <br />ENGINEER has issued a notice to OWNER and <br />CONTRACTOR in accordance with paragraph 14.07.8 that the <br />Work is acceptable (except as otherwise expressly provided in <br />connection with Substantial Completion). <br />6.14 Safety Representative <br />A. CONTRACTOR shall designate a qualified and <br />experienced safety representative at the Site whose duties and <br />responsibilities shall be the prevention of accidents and the <br />maintaining and supervising of safety precautions and <br />programs. <br />6.15 Hazard Communication Programs <br />A. CONTRACTOR shall be responsible for coordinating <br />any exchange of material safety data sheets or other hazard <br />communication information required to be made available to or <br />exchanged between or among employers at the Site in <br />accordance with Laws or Regulations. <br />6.16 Emergencies <br />A. In emergencies affecting the safety or protection of <br />persons or the Work or property at the Site or adjacent thereto, <br />CONTRACTOR is obligated to act to prevent threatened dam- <br />age, injury, or loss. CONTRACTOR shall give ENGINEER <br />prompt written notice if CONTRACTOR believes that any <br />significant changes in the Work or variations from the Contract <br />Documents have been caused thereby or are required as a <br />result thereof. If ENGINEER determines that a change in the <br />Contract Documents is required because of the action taken by <br />CONTRACTOR in response to such an emergency, a Work <br />Change Directive or Change Order will be issued. <br />6.17 Shop Drawings and Samples <br />A. CONTRACTOR shall submit Shop Drawings to <br />ENGINEER for review and approval in accordance with the <br />acceptable schedule of Shop Drawings and Sample submittals. <br />All submittals will be identified as ENGINEER may require and <br />in the number of copies specified in the General Requirements. <br />The data shown on the Shop Drawings will be complete with <br />respect to quantities, dimensions, specified performance and <br />design criteria, materials, and similar data to show ENGINEER <br />the services, materials, and equipment CONTRACTOR <br />proposes to provide and to enable ENGINEER to review the <br />information for the limited purposes required by paragraph <br />6.17.E. <br />00700 General Conditions (EJCDC).doc <br />00700- 19 <br />1:\07-02912Inch WM - Vero lake Estemsl umentsVcpons%Bidding Contract Specificationsw700 Gmaal Conditions IE3CDC)ri <br />