only to determine if the items covered by the submittals <br /> B. CONTRACTOR shall also submit Samples to will, after installation or incorporation in the Work, con- <br /> ENGINEER for review and approval in accordance with the form to the information given in the Contract Documents <br /> acceptable schedule of Shop Drawings and Sample submittals. and be compatible with the design concept of the <br /> Each Sample will be identified clearly as to material , Supplier, completed Project as a functioning whole as indicated <br /> pertinent data such as catalog numbers, and the use for which by the Contract Documents. <br /> intended and otherwise as ENGINEER may require to enable <br /> ENGINEER to review the submittal for the limited purposes 2. ENGINEER's review and approval will not extend <br /> required by paragraph 6. 17. E. The numbers of each Sample to to means, methods, techniques, sequences, or <br /> be submitted will be as specified in the Specifications. procedures of construction (except where a particular <br /> means, method, technique, sequence, or procedure of <br /> C. Where a Shop Drawing or Sample is required by the construction is specifically and expressly called for by <br /> Contract Documents or the schedule of Shop Drawings and the Contract Documents) or to safety precautions or <br /> Sample submittals acceptable to ENGINEER as required by programs incident thereto. The review and approval of <br /> paragraph 2.07, any related Work performed prior to a separate item as such will not indicate approval of the <br /> ENGINEER's review and approval of the pertinent submittal will assembly in which the item functions, <br /> be at the sole expense and responsibility of CONTRACTOR. <br /> 3. ENGINEER's review and approval of Shop <br /> D. Submittal Procedures Drawings or Samples shall not relieve CONTRACTOR <br /> from responsibility for any variation from the require- <br /> 1 . Before submitting each Shop Drawing or Sam- ments of the Contract Documents unless CONTRAC- <br /> ple, CONTRACTOR shall have determined and verified: TOR has in writing called ENGINEER's attention to <br /> each such variation at the time of each submittal as re- <br /> a. all field measurements, quantifies, dimen- quired by paragraph 6. 17.D.3 and ENGINEER has <br /> sions, specified performance criteria, installation given written approval of each such variation by specific <br /> requirements, materials, catalog numbers, and written notation thereof incorporated in or accompany- <br /> similar information with respect thereto; ing the Shop Drawing or Sample approval; nor will any <br /> approval by ENGINEER relieve CONTRACTOR from <br /> b. all materials with respect to intended use, responsibility for complying with the requirements of <br /> fabrication, shipping, handling, storage, assembly, paragraph 6. 17. D. 1 . <br /> and installation pertaining to the performance of the <br /> Work; F. Resubmittal Procedures <br /> c. all information relative to means, methods, 1 .CONTRACTOR shall make corrections required <br /> techniques, sequences, and procedures of by ENGINEER and shall return the required number of <br /> construction and safety precautions and programs corrected copies of Shop Drawings and submit as <br /> incident thereto; and required new Samples for review and approval. CON- <br /> TRACTOR shall direct specific attention in writing to <br /> d. CONTRACTOR shall also have reviewed revisions other than the corrections called for by ENGI- <br /> and coordinated each Shop Drawing or Sample with NEER on previous submittals. <br /> other Shop Drawings and Samples and with the <br /> requirements of the Work and the Contract Docu- 6. 18 Continuing the Work <br /> ments. <br /> A. CONTRACTOR shall carry on the Work and adhere <br /> 2. Each submittal shall bear a stamp or specific to the progress schedule during all disputes or disagreements <br /> written indication that CONTRACTOR has safisfied with OWNER. No Work shall be delayed or postponed pending <br /> CONTRACTOR's obligations under the Contract resolution of any disputes or disagreements, except as <br /> Documents with respect to CONTRACTOR's review permitted by paragraph 15.04 or as OWNER and <br /> and approval of that submittal. CONTRACTOR may otherwise agree in writing. <br /> 3.At the time of each submittal, CONTRACTOR 6. 19 CONTRACTOR's General Warranty and Guarantee <br /> shall give ENGINEER specific written notice of such <br /> variations, if any, that the Shop Drawing or Sample A. CONTRACTOR warrants and guarantees to <br /> submitted may have from the requirements of the OWNER, ENGINEER, and ENGINEER's Consultants that all <br /> Contract Documents, such notice to be in a written com- Work will be in accordance with the Contract Documents and <br /> munication separate from the submittal; and, in addition, will not be defective. CONTRACTOR's warranty and guarantee <br /> shall cause a specific notation to be made on each hereunder excludes defects or damage caused by: <br /> Shop Drawing and Sample submitted to ENGINEER for <br /> review and approval of each such variation. 1 . abuse, modification , or improper maintenance or <br /> operation by persons other than CONTRACTOR, Sub- <br /> E. ENGINEER's Review contractors, Suppliers, or any other individual or entity <br /> for whom CONTRACTOR is responsible; or <br /> 1 . ENGINEER will timely review and approve Shop <br /> Drawings and Samples in accordance with the schedule 2.normal wear and tear under normal usage. <br /> of Shop Drawings and Sample submittals acceptable to <br /> ENGINEER. ENGINEER's review and approval will be <br /> 00700 General Conditions (E1CDC).doc <br /> 00700 - 20 <br /> I:W7-029 32 Inch W - Vera take Eoates\DaumentsViepons)BiMing Contract Speci5catlom)00700 General Conditions (OCDC)Ac <br />