B. CONTRACTOR shall also submit Samples to <br />ENGINEER for review and approval in accordance with the <br />acceptable schedule of Shop Drawings and Sample submittals. <br />Each Sample will be identified clearly as to material, Supplier, <br />pertinent data such as catalog numbers, and the use for which <br />intended and otherwise as ENGINEER may require to enable <br />ENGINEER to review the submittal for the limited purposes <br />required by paragraph 6.17.E. The numbers of each Sample to <br />be submitted will be as specified in the Specifications. <br />C. Where a Shop Drawing or Sample is required by the <br />Contract Documents or the schedule of Shop Drawings and <br />Sample submittals acceptable to ENGINEER as required by <br />paragraph 2.07, any related Work performed prior to <br />ENGINEER's review and approval of the pertinent submittal will <br />be at the sole expense and responsibility of CONTRACTOR. <br />D. Submittal Procedures <br />a. all field measurements, quantifies, dimen- <br />sions, specified performance criteria, installation <br />requirements, materials, catalog numbers, and <br />similar information with respect thereto; <br />b. all materials with respect to intended use, <br />fabrication, shipping, handling, storage, assembly, <br />and installation pertaining to the performance of the <br />Work; <br />c. all information relative to means, methods, <br />techniques, sequences, and procedures of <br />construction and safety precautions and programs <br />incident thereto; and <br />d. CONTRACTOR shall also have reviewed <br />and coordinated each Shop Drawing or Sample with <br />other Shop Drawings and Samples and with the <br />requirements of the Work and the Contract Docu- <br />ments. <br />only to determine if the items covered by the submittals <br />will, after installation or incorporation in the Work, con- <br />form to the information given in the Contract Documents <br />and be compatible with the design concept of the <br />completed Project as a functioning whole as indicated <br />by the Contract Documents. <br />2.ENGINEER's review and approval will not extend <br />to means, methods, techniques, sequences, or <br />procedures of construction (except where a particular <br />means, method, technique, sequence, or procedure of <br />construction is specifically and expressly called for by <br />the Contract Documents) or to safety precautions or <br />programs incident thereto. The review and approval of <br />a separate item as such will not indicate approval of the <br />assembly in which the item functions. <br />3.ENGINEER's review and approval of Shop <br />Drawings or Samples shall not relieve CONTRACTOR <br />from responsibility for any variation from the require- <br />ments of the Contract Documents unless CONTRAC- <br />TOR has in writing called ENGINEER's attention to <br />each such variation at the time of each submittal as re- <br />quired by paragraph 6.17.D.3 and ENGINEER has <br />given written approval of each such variation by specific <br />written notation thereof incorporated in or accompany- <br />ing the Shop Drawing or Sample approval; nor will any <br />approval by ENGINEER relieve CONTRACTOR from <br />responsibility for complying with the requirements of <br />paragraph 6.17.D.1. <br />F. Resubmittal Procedures <br />1.CONTRACTOR shall make corrections required <br />by ENGINEER and shall return the required number of <br />corrected copies of Shop Drawings and submit as <br />required new Samples for review and approval. CON- <br />TRACTOR shall direct specific attention in writing to <br />revisions other than the corrections called for by ENGI- <br />NEER on previous submittals. <br />6.18 Continuing the Work <br />A. CONTRACTOR shall carry on the Work and adhere <br />2.Each submittal shall bear a stamp or specific to the progress schedule during all disputes or disagreements <br />written indication that CONTRACTOR has satisfied with OWNER. No Work shall be delayed or postponed pending <br />CONTRACTOR's obligations under the Contract resolution of any disputes or disagreements, except as <br />Documents with respect to CONTRACTOR's review permitted by paragraph 15.04 or as OWNER and <br />and approval of that submittal. CONTRACTOR may otherwise agree in writing. <br />3.At the fime of each submittal, CONTRACTOR <br />shall give ENGINEER specific written notice of such <br />variations, if any, that the Shop Drawing or Sample <br />submitted may have from the requirements of the <br />Contract Documents, such notice to be in a written com- <br />munication separate from the submittal; and, in addition, <br />shall cause a specific notation to be made on each <br />Shop Drawing and Sample submitted to ENGINEER for <br />review and approval of each such variation. <br />E. ENGINEER's Review <br />1.ENGINEER will timely review and approve Shop <br />Drawings and Samples in accordance with the schedule <br />of Shop Drawings and Sample submittals acceptable to <br />ENGINEER. ENGINEER's review and approval will be <br />6.19 CONTRACTOR's General Warranty and Guarantee <br />A. CONTRACTOR warrants and guarantees to <br />OWNER, ENGINEER, and ENGINEER's Consultants that all <br />Work will be in accordance with the Contract Documents and <br />will not be defective. CONTRACTOR's warranty and guarantee <br />hereunder excludes defects or damage caused by: <br />1.abuse, modification, or improper maintenance or <br />operation by persons other than CONTRACTOR, Sub- <br />contractors, Suppliers, or any other individual or entity <br />for whom CONTRACTOR is responsible; or <br />2.normal wear and tear under normal usage. <br />00700 General Conditions (E1CDC).doc <br />00700-20 <br />I:W7-029 32 Inch W -Vera take Eoates\DaumentsViepons�Wing Contract Speci5catlom)00700 General Conditions(OCDC)Aoc <br />1.Before submitting <br />each <br />Shop Drawing <br />or Sam- <br />ple, <br />CONTRACTOR shall <br />have <br />determined and <br />verified: <br />a. all field measurements, quantifies, dimen- <br />sions, specified performance criteria, installation <br />requirements, materials, catalog numbers, and <br />similar information with respect thereto; <br />b. all materials with respect to intended use, <br />fabrication, shipping, handling, storage, assembly, <br />and installation pertaining to the performance of the <br />Work; <br />c. all information relative to means, methods, <br />techniques, sequences, and procedures of <br />construction and safety precautions and programs <br />incident thereto; and <br />d. CONTRACTOR shall also have reviewed <br />and coordinated each Shop Drawing or Sample with <br />other Shop Drawings and Samples and with the <br />requirements of the Work and the Contract Docu- <br />ments. <br />only to determine if the items covered by the submittals <br />will, after installation or incorporation in the Work, con- <br />form to the information given in the Contract Documents <br />and be compatible with the design concept of the <br />completed Project as a functioning whole as indicated <br />by the Contract Documents. <br />2.ENGINEER's review and approval will not extend <br />to means, methods, techniques, sequences, or <br />procedures of construction (except where a particular <br />means, method, technique, sequence, or procedure of <br />construction is specifically and expressly called for by <br />the Contract Documents) or to safety precautions or <br />programs incident thereto. The review and approval of <br />a separate item as such will not indicate approval of the <br />assembly in which the item functions. <br />3.ENGINEER's review and approval of Shop <br />Drawings or Samples shall not relieve CONTRACTOR <br />from responsibility for any variation from the require- <br />ments of the Contract Documents unless CONTRAC- <br />TOR has in writing called ENGINEER's attention to <br />each such variation at the time of each submittal as re- <br />quired by paragraph 6.17.D.3 and ENGINEER has <br />given written approval of each such variation by specific <br />written notation thereof incorporated in or accompany- <br />ing the Shop Drawing or Sample approval; nor will any <br />approval by ENGINEER relieve CONTRACTOR from <br />responsibility for complying with the requirements of <br />paragraph 6.17.D.1. <br />F. Resubmittal Procedures <br />1.CONTRACTOR shall make corrections required <br />by ENGINEER and shall return the required number of <br />corrected copies of Shop Drawings and submit as <br />required new Samples for review and approval. CON- <br />TRACTOR shall direct specific attention in writing to <br />revisions other than the corrections called for by ENGI- <br />NEER on previous submittals. <br />6.18 Continuing the Work <br />A. CONTRACTOR shall carry on the Work and adhere <br />2.Each submittal shall bear a stamp or specific to the progress schedule during all disputes or disagreements <br />written indication that CONTRACTOR has satisfied with OWNER. No Work shall be delayed or postponed pending <br />CONTRACTOR's obligations under the Contract resolution of any disputes or disagreements, except as <br />Documents with respect to CONTRACTOR's review permitted by paragraph 15.04 or as OWNER and <br />and approval of that submittal. CONTRACTOR may otherwise agree in writing. <br />3.At the fime of each submittal, CONTRACTOR <br />shall give ENGINEER specific written notice of such <br />variations, if any, that the Shop Drawing or Sample <br />submitted may have from the requirements of the <br />Contract Documents, such notice to be in a written com- <br />munication separate from the submittal; and, in addition, <br />shall cause a specific notation to be made on each <br />Shop Drawing and Sample submitted to ENGINEER for <br />review and approval of each such variation. <br />E. ENGINEER's Review <br />1.ENGINEER will timely review and approve Shop <br />Drawings and Samples in accordance with the schedule <br />of Shop Drawings and Sample submittals acceptable to <br />ENGINEER. ENGINEER's review and approval will be <br />6.19 CONTRACTOR's General Warranty and Guarantee <br />A. CONTRACTOR warrants and guarantees to <br />OWNER, ENGINEER, and ENGINEER's Consultants that all <br />Work will be in accordance with the Contract Documents and <br />will not be defective. CONTRACTOR's warranty and guarantee <br />hereunder excludes defects or damage caused by: <br />1.abuse, modification, or improper maintenance or <br />operation by persons other than CONTRACTOR, Sub- <br />contractors, Suppliers, or any other individual or entity <br />for whom CONTRACTOR is responsible; or <br />2.normal wear and tear under normal usage. <br />00700 General Conditions (E1CDC).doc <br />00700-20 <br />I:W7-029 32 Inch W -Vera take Eoates\DaumentsViepons�Wing Contract Speci5catlom)00700 General Conditions(OCDC)Aoc <br />