B. CONTRACTOR shall also submit Samples to
<br />ENGINEER for review and approval in accordance with the
<br />acceptable schedule of Shop Drawings and Sample submittals.
<br />Each Sample will be identified clearly as to material, Supplier,
<br />pertinent data such as catalog numbers, and the use for which
<br />intended and otherwise as ENGINEER may require to enable
<br />ENGINEER to review the submittal for the limited purposes
<br />required by paragraph 6.17.E. The numbers of each Sample to
<br />be submitted will be as specified in the Specifications.
<br />C. Where a Shop Drawing or Sample is required by the
<br />Contract Documents or the schedule of Shop Drawings and
<br />Sample submittals acceptable to ENGINEER as required by
<br />paragraph 2.07, any related Work performed prior to
<br />ENGINEER's review and approval of the pertinent submittal will
<br />be at the sole expense and responsibility of CONTRACTOR.
<br />D. Submittal Procedures
<br />a. all field measurements, quantifies, dimen-
<br />sions, specified performance criteria, installation
<br />requirements, materials, catalog numbers, and
<br />similar information with respect thereto;
<br />b. all materials with respect to intended use,
<br />fabrication, shipping, handling, storage, assembly,
<br />and installation pertaining to the performance of the
<br />Work;
<br />c. all information relative to means, methods,
<br />techniques, sequences, and procedures of
<br />construction and safety precautions and programs
<br />incident thereto; and
<br />d. CONTRACTOR shall also have reviewed
<br />and coordinated each Shop Drawing or Sample with
<br />other Shop Drawings and Samples and with the
<br />requirements of the Work and the Contract Docu-
<br />ments.
<br />only to determine if the items covered by the submittals
<br />will, after installation or incorporation in the Work, con-
<br />form to the information given in the Contract Documents
<br />and be compatible with the design concept of the
<br />completed Project as a functioning whole as indicated
<br />by the Contract Documents.
<br />2.ENGINEER's review and approval will not extend
<br />to means, methods, techniques, sequences, or
<br />procedures of construction (except where a particular
<br />means, method, technique, sequence, or procedure of
<br />construction is specifically and expressly called for by
<br />the Contract Documents) or to safety precautions or
<br />programs incident thereto. The review and approval of
<br />a separate item as such will not indicate approval of the
<br />assembly in which the item functions.
<br />3.ENGINEER's review and approval of Shop
<br />Drawings or Samples shall not relieve CONTRACTOR
<br />from responsibility for any variation from the require-
<br />ments of the Contract Documents unless CONTRAC-
<br />TOR has in writing called ENGINEER's attention to
<br />each such variation at the time of each submittal as re-
<br />quired by paragraph 6.17.D.3 and ENGINEER has
<br />given written approval of each such variation by specific
<br />written notation thereof incorporated in or accompany-
<br />ing the Shop Drawing or Sample approval; nor will any
<br />approval by ENGINEER relieve CONTRACTOR from
<br />responsibility for complying with the requirements of
<br />paragraph 6.17.D.1.
<br />F. Resubmittal Procedures
<br />1.CONTRACTOR shall make corrections required
<br />by ENGINEER and shall return the required number of
<br />corrected copies of Shop Drawings and submit as
<br />required new Samples for review and approval. CON-
<br />TRACTOR shall direct specific attention in writing to
<br />revisions other than the corrections called for by ENGI-
<br />NEER on previous submittals.
<br />6.18 Continuing the Work
<br />A. CONTRACTOR shall carry on the Work and adhere
<br />2.Each submittal shall bear a stamp or specific to the progress schedule during all disputes or disagreements
<br />written indication that CONTRACTOR has satisfied with OWNER. No Work shall be delayed or postponed pending
<br />CONTRACTOR's obligations under the Contract resolution of any disputes or disagreements, except as
<br />Documents with respect to CONTRACTOR's review permitted by paragraph 15.04 or as OWNER and
<br />and approval of that submittal. CONTRACTOR may otherwise agree in writing.
<br />3.At the fime of each submittal, CONTRACTOR
<br />shall give ENGINEER specific written notice of such
<br />variations, if any, that the Shop Drawing or Sample
<br />submitted may have from the requirements of the
<br />Contract Documents, such notice to be in a written com-
<br />munication separate from the submittal; and, in addition,
<br />shall cause a specific notation to be made on each
<br />Shop Drawing and Sample submitted to ENGINEER for
<br />review and approval of each such variation.
<br />E. ENGINEER's Review
<br />1.ENGINEER will timely review and approve Shop
<br />Drawings and Samples in accordance with the schedule
<br />of Shop Drawings and Sample submittals acceptable to
<br />ENGINEER. ENGINEER's review and approval will be
<br />6.19 CONTRACTOR's General Warranty and Guarantee
<br />A. CONTRACTOR warrants and guarantees to
<br />OWNER, ENGINEER, and ENGINEER's Consultants that all
<br />Work will be in accordance with the Contract Documents and
<br />will not be defective. CONTRACTOR's warranty and guarantee
<br />hereunder excludes defects or damage caused by:
<br />1.abuse, modification, or improper maintenance or
<br />operation by persons other than CONTRACTOR, Sub-
<br />contractors, Suppliers, or any other individual or entity
<br />for whom CONTRACTOR is responsible; or
<br />2.normal wear and tear under normal usage.
<br />00700 General Conditions (E1CDC).doc
<br />00700-20
<br />I:W7-029 32 Inch W -Vera take Eoates\DaumentsViepons�Wing Contract Speci5catlom)00700 General Conditions(OCDC)Aoc
<br />1.Before submitting
<br />each
<br />Shop Drawing
<br />or Sam-
<br />ple,
<br />CONTRACTOR shall
<br />have
<br />determined and
<br />verified:
<br />a. all field measurements, quantifies, dimen-
<br />sions, specified performance criteria, installation
<br />requirements, materials, catalog numbers, and
<br />similar information with respect thereto;
<br />b. all materials with respect to intended use,
<br />fabrication, shipping, handling, storage, assembly,
<br />and installation pertaining to the performance of the
<br />Work;
<br />c. all information relative to means, methods,
<br />techniques, sequences, and procedures of
<br />construction and safety precautions and programs
<br />incident thereto; and
<br />d. CONTRACTOR shall also have reviewed
<br />and coordinated each Shop Drawing or Sample with
<br />other Shop Drawings and Samples and with the
<br />requirements of the Work and the Contract Docu-
<br />ments.
<br />only to determine if the items covered by the submittals
<br />will, after installation or incorporation in the Work, con-
<br />form to the information given in the Contract Documents
<br />and be compatible with the design concept of the
<br />completed Project as a functioning whole as indicated
<br />by the Contract Documents.
<br />2.ENGINEER's review and approval will not extend
<br />to means, methods, techniques, sequences, or
<br />procedures of construction (except where a particular
<br />means, method, technique, sequence, or procedure of
<br />construction is specifically and expressly called for by
<br />the Contract Documents) or to safety precautions or
<br />programs incident thereto. The review and approval of
<br />a separate item as such will not indicate approval of the
<br />assembly in which the item functions.
<br />3.ENGINEER's review and approval of Shop
<br />Drawings or Samples shall not relieve CONTRACTOR
<br />from responsibility for any variation from the require-
<br />ments of the Contract Documents unless CONTRAC-
<br />TOR has in writing called ENGINEER's attention to
<br />each such variation at the time of each submittal as re-
<br />quired by paragraph 6.17.D.3 and ENGINEER has
<br />given written approval of each such variation by specific
<br />written notation thereof incorporated in or accompany-
<br />ing the Shop Drawing or Sample approval; nor will any
<br />approval by ENGINEER relieve CONTRACTOR from
<br />responsibility for complying with the requirements of
<br />paragraph 6.17.D.1.
<br />F. Resubmittal Procedures
<br />1.CONTRACTOR shall make corrections required
<br />by ENGINEER and shall return the required number of
<br />corrected copies of Shop Drawings and submit as
<br />required new Samples for review and approval. CON-
<br />TRACTOR shall direct specific attention in writing to
<br />revisions other than the corrections called for by ENGI-
<br />NEER on previous submittals.
<br />6.18 Continuing the Work
<br />A. CONTRACTOR shall carry on the Work and adhere
<br />2.Each submittal shall bear a stamp or specific to the progress schedule during all disputes or disagreements
<br />written indication that CONTRACTOR has satisfied with OWNER. No Work shall be delayed or postponed pending
<br />CONTRACTOR's obligations under the Contract resolution of any disputes or disagreements, except as
<br />Documents with respect to CONTRACTOR's review permitted by paragraph 15.04 or as OWNER and
<br />and approval of that submittal. CONTRACTOR may otherwise agree in writing.
<br />3.At the fime of each submittal, CONTRACTOR
<br />shall give ENGINEER specific written notice of such
<br />variations, if any, that the Shop Drawing or Sample
<br />submitted may have from the requirements of the
<br />Contract Documents, such notice to be in a written com-
<br />munication separate from the submittal; and, in addition,
<br />shall cause a specific notation to be made on each
<br />Shop Drawing and Sample submitted to ENGINEER for
<br />review and approval of each such variation.
<br />E. ENGINEER's Review
<br />1.ENGINEER will timely review and approve Shop
<br />Drawings and Samples in accordance with the schedule
<br />of Shop Drawings and Sample submittals acceptable to
<br />ENGINEER. ENGINEER's review and approval will be
<br />6.19 CONTRACTOR's General Warranty and Guarantee
<br />A. CONTRACTOR warrants and guarantees to
<br />OWNER, ENGINEER, and ENGINEER's Consultants that all
<br />Work will be in accordance with the Contract Documents and
<br />will not be defective. CONTRACTOR's warranty and guarantee
<br />hereunder excludes defects or damage caused by:
<br />1.abuse, modification, or improper maintenance or
<br />operation by persons other than CONTRACTOR, Sub-
<br />contractors, Suppliers, or any other individual or entity
<br />for whom CONTRACTOR is responsible; or
<br />2.normal wear and tear under normal usage.
<br />00700 General Conditions (E1CDC).doc