Laserfiche WebLink
C. If the proper execution or results of any part of <br />CONTRACTOR's Work depends upon work performed by <br />others under this Article 7, CONTRACTOR shall inspect such <br />other work and promptly report to ENGINEER in writing any <br />delays, defects, or deficiencies in such other work that render it <br />unavailable or unsuitable for the proper execution and results of <br />CONTRACTOR's Work. CONTRACTOR's failure to so report <br />will constitute an acceptance of such other work as ft and <br />proper for integration with CONTRACTOR's Work except for <br />latent defects and deficiencies in such other work. <br />7.02 Coordination <br />A. If OWNER intends to contract with others for the <br />performance of other work on the Project at the Site, the <br />following will be set forth in Supplementary Conditions: <br />1.the individual or entity who will have authority <br />and responsibility for coordination of the activities <br />among the various contractors will be identified; <br />2.the specific matters to be covered by such <br />authority and responsibility will be itemized; and <br />3.the extent of such authority and responsibilities <br />will be provided. <br />B. Unless otherwise provided in the Supplementary <br />Conditions, OWNER shall have sole authority and responsibility <br />for such coordination. <br />ARTICLE 8 - OWNER'S RESPONSIBILITIES <br />8.01 Communications to Contractor <br />A. Except as otherwise provided in these General Condi- <br />tions, OWNER shall issue all communications to <br />CONTRACTOR through ENGINEER. <br />8.02 Replacement of ENGINEER <br />A. In case of termination of the employment of ENGI- <br />NEER, OWNER shall appoint an engineer to whom <br />CONTRACTOR makes no reasonable objection, whose status <br />under the Contract Documents shall be that of the former ENGI- <br />NEER. <br />8.03 Furnish Data <br />A. OWNER shall promptly furnish the data required of <br />OWNER under the Contract Documents. <br />8.04 Pay Promptly When Due <br />A. OWNER shall make payments to CONTRACTOR <br />promptly when they are due as provided in paragraphs 14.02.0 <br />and 14.07.C. <br />8.05 Lands and Easements; Reports and Tests <br />available to CONTRACTOR copies of reports of explorations <br />and tests of subsurface conditions and drawings of physical <br />conditions in or relating to existing surface or subsurface <br />structures at or contiguous to the Site that have been utilized by <br />ENGINEER in preparing the Contract Documents. <br />8.06 Insurance <br />A. OWNER's responsibilities, if any, in respect to pur- <br />chasing and maintaining liability and property insurance are set <br />forth in Article 5. <br />8.07 Change Orders <br />A. OWNER is obligated to execute Change Orders as <br />indicated in paragraph 10.03. <br />8.08 Inspections, Tests, and Approvals <br />A. OWNER's responsibility in respect to certain inspec- <br />tions, tests, and approvals is set forth in paragraph 13.03.8. <br />8.09 Limitations on OWNER's Responsibilities <br />A. The OWNER shall not supervise, direct, or have <br />control or authority over, nor be responsible for, <br />CONTRACTOR's means, methods, techniques, sequences, or <br />procedures of construction, or the safety precautions and <br />programs incident thereto, or for any failure of CONTRACTOR <br />to comply with Laws and Regulations applicable to the perfor- <br />mance of the Work. OWNER will not be responsible for <br />CONTRACTOR's failure to perform the Work in accordance <br />with the Contract Documents. <br />8.10 Undisclosed Hazardous Environmental Condition <br />A. OWNER's responsibility in respect to an undisclosed <br />Hazardous Environmental Condition is set forth in paragraph <br />4.06. <br />8.11 Evidence of Financial Arrangements <br />A. If and to the extent OWNER has agreed to furnish <br />CONTRACTOR reasonable evidence that financial <br />arrangements have been made to satisfy OWNER's obligations <br />under the Contract Documents, OWNER's responsibility in <br />respect thereof will be as set forth in the Supplementary <br />Conditions. <br />ARTICLE 9 - ENGINEER'S STATUS DURING <br />CONSTRUCTION <br />9.01 OWNER'S Representative <br />A. ENGINEER will be OWNER's representative during <br />the construction period. The duties and responsibilities and the <br />limitations of authority of ENGINEER as OWNER's <br />representative during construction are set forth in the Contract <br />Documents and will not be changed without written consent of <br />OWNER and ENGINEER. <br />A. OWNER's duties in respect of providing lands and <br />easements and providing engineering surveys to establish 9.02 Visits to Site <br />reference points are set forth in paragraphs 4.01 and 4.05. <br />Paragraph 4.02 refers to OWNER's identifying and making <br />00700 General Conditions (EICDC).doc <br />00700-22 <br />P07-029 12 Inch WM- Vtno Lake Estaiest umentsQke i;Midding Conuuct Sirmifications\00700 General Condition(EICDC.doc <br />