Laserfiche WebLink
C. If the proper execution or results of any part of available to CONTRACTOR copies of reports of explorations <br /> CONTRACTOR's Work depends upon work performed by and tests of subsurface conditions and drawings of physical <br /> others under this Article 7, CONTRACTOR shall inspect such conditions in or relating to existing surface or subsurface <br /> other work and promptly report to ENGINEER in writing any structures at or contiguous to the Site that have been utilized by <br /> delays, defects, or deficiencies in such other work that render it ENGINEER in preparing the Contract Documents. <br /> unavailable or unsuitable for the proper execution and results of <br /> CONTRACTOR's Work. CONTRACTOR's failure to so report 8 .06 Insurance <br /> will constitute an acceptance of such other work as ft and <br /> proper for integration with CONTRACTOR's Work except for A. OWNER's responsibilities, if any, in respect to pur- <br /> latent defects and deficiencies in such other work. chasing and maintaining liability and property insurance are set <br /> forth in Article 5. <br /> 7.02 Coordination <br /> 8 .07 Change Orders <br /> A. If OWNER intends to contract with others for the <br /> performance of other work on the Project at the Site, the A. OWNER is obligated to execute Change Orders as <br /> following will be set forth in Supplementary Conditions: indicated in paragraph 10 .03. <br /> 1 .the individual or entity who will have authority 8 .08 Inspections, Tests, and Approvals <br /> and responsibility for coordination of the activities <br /> among the various contractors will be identified; A. OWNER's responsibility in respect to certain inspec- <br /> tions, tests, and approvals is set forth in paragraph 13.03. 8 . <br /> 2.the specific matters to be covered by such <br /> authority and responsibility will be itemized; and 8.09 Limitations on OWNER's Responsibilities <br /> 3.the extent of such authority and responsibilities A. The OWNER shall not supervise, direct, or have <br /> will be provided . control or authority over, nor be responsible for, <br /> CONTRACTOR's means, methods, techniques, sequences, or <br /> B. Unless otherwise provided in the Supplementary procedures of construction, or the safety precautions and <br /> Conditions, OWNER shall have sole authority and responsibility programs incident thereto, or for any failure of CONTRACTOR <br /> for such coordination. to comply with Laws and Regulations applicable to the perfor- <br /> mance of the Work. OWNER will not be responsible for <br /> CONTRACTOR's failure to perform the Work in accordance <br /> ARTICLE 8 - OWNER'S RESPONSIBILITIES with the Contract Documents. <br /> 8. 10 Undisclosed Hazardous Environmental Condition <br /> 8.01 Communications to Contractor <br /> A. OWNER's responsibility in respect to an undisclosed <br /> A. Except as otherwise provided in these General Condi- Hazardous Environmental Condition is set forth in paragraph <br /> tions, OWNER shall issue all communications to 4.06. <br /> CONTRACTOR through ENGINEER. <br /> 8. 11 Evidence of Financial Arrangements <br /> 8.02 Replacement of ENGINEER <br /> A. If and to the extent OWNER has agreed to furnish <br /> A. In case of termination of the employment of ENGI- CONTRACTOR reasonable evidence that financial <br /> NEER, OWNER shall appoint an engineer to whom arrangements have been made to satisfy OWNER's obligations <br /> CONTRACTOR makes no reasonable objection, whose status under the Contract Documents, OWNER's responsibility in <br /> under the Contract Documents shall be that of the former ENGI- respect thereof will be as set forth in the Supplementary <br /> NEER. Conditions. <br /> 8.03 Furnish Data <br /> ARTICLE 9 - ENGINEER'S STATUS DURING <br /> A. OWNER shall promptly furnish the data required of CONSTRUCTION <br /> OWNER under the Contract Documents. <br /> 8.04 Pay Promptly When Due 9.01 OWNER'S Representative <br /> A. OWNER shall make payments to CONTRACTOR A. ENGINEER will be OWNER's representative during <br /> promptly when they are due as provided in paragraphs 14.02.0 the construction period. The duties and responsibilities and the <br /> and 14.07.C. limitations of authority of ENGINEER as OWNER's <br /> representative during construction are set forth in the Contract <br /> 8.05 Lands and Easements; Reports and Tests Documents and will not be changed without written consent of <br /> OWNER and ENGINEER. <br /> A. OWNER's duties in respect of providing lands and <br /> easements and providing engineering surveys to establish 9.02 Visits to Site <br /> reference points are set forth in paragraphs 4.01 and 4.05. <br /> Paragraph 4.02 refers to OWNER's identifying and making <br /> 00700 General Conditions (EICDC).doc <br /> 00700 - 22 <br /> P07-029 12 Inch WM - Vtno Lake Estaiest umentsQke i ;Midding Conuuct Sirmifications\00700 General Condition (EICDC).doc <br />