A. ENGINEER will make visits to the Site at intervals <br />appropriate to the various stages of construction as ENGINEER <br />deems necessary in order to observe as an experienced and <br />qualified design professional the progress that has been made <br />and the quality of the various aspects of CONTRACTOR's <br />executed Work. Based on information obtained during such <br />visits and observations, ENGINEER, for the benefit of OWNER, <br />will determine, in general, if the Work is proceeding in <br />accordance with the Contract Documents. ENGINEER will not <br />be required to make exhaustive or continuous inspections on <br />the Site to check the quality or quantity of the Work. <br />ENGINEER's efforts will be directed toward providing for <br />OWNER a greater degree of confidence that the completed <br />Work will conform generally to the Contract Documents. On the <br />basis of such visits and observations, ENGINEER will keep <br />OWNER informed of the progress of the Work and will endeav- <br />or to guard OWNER against defective Work. <br />B. ENGINEER's visits and observations are subject to all <br />the limitations on ENGINEER's authority and responsibility set <br />forth in paragraph 9.10, and particularly, but without limitation, <br />during or as a result of ENGINEER's visits or observations of <br />CONTRACTOR's Work ENGINEER will not supervise, direct, <br />control, or have authority over or be responsible for <br />CONTRACTOR's means, methods, techniques, sequences, or <br />procedures of construction, or the safety precautions and <br />programs incident thereto, or for any failure of CONTRACTOR <br />to comply with Laws and Regulations applicable to the <br />performance of the Work. <br />9.03 Project Representative <br />A. If OWNER and ENGINEER agree, ENGINEER will <br />furnish a Resident Project Representative to assist ENGINEER <br />in providing more extensive observation of the Work. The <br />responsibilities and authority and limitations thereon of any such <br />Resident Project Representative and assistants will be as <br />provided in paragraph 9.10 and in the Supplementary <br />Conditions. If OWNER designates another representative or <br />agent to represent OWNER at the Site who is not ENGINEER's <br />Consultant, agent or employee, the responsibilities and <br />authority and limitations thereon of such other individual or <br />entity will be as provided in the Supplementary Conditions. <br />9.04 Clarifications and Interpretations <br />A. - ENGINEER will issue with reasonable promptness <br />such written clarifications or interpretations of the requirements <br />of the Contract Documents as ENGINEER may determine <br />necessary, which shall be consistent with the intent of and <br />reasonably inferable from the Contract Documents. Such <br />written clarifications and interpretations will be binding on <br />OWNER and CONTRACTOR. If OWNER and CONTRACTOR <br />are unable to agree on entitlement to or on the amount or <br />extent, if any, of any adjustment in the Contract Price or <br />Contract Times, or both, that should be allowed as a result of a <br />written clarification or interpretation, a Claim may be made <br />therefore as provided in paragraph 10.05. <br />9.05 Authorized Variations in Work <br />A. ENGINEER may authorize minor variations in the <br />Work from the requirements of the Contract Documents which <br />do not involve an adjustment in the Contract Price or the <br />Contract Times and are compatible with the design concept of <br />the completed Project as a functioning whole as indicated by <br />the Contract Documents. These may be accomplished by a <br />Field Order and will be binding on OWNER and also on CON- <br />TRACTOR, who shall perform the Work involved promptly. If <br />OWNER and CONTRACTOR are unable to agree on <br />entitlement to or on the amount or extent, if any, of any <br />adjustment in the Contract Price or Contract Times, or both, as <br />a result of a Field Order, a Claim may be made therefore as <br />provided in paragraph 10.05. <br />9.06 Rejecting Defective Work <br />A. ENGINEER will have authority to disapprove or reject <br />Work which ENGINEER believes to be defective, or that <br />ENGINEER believes will not produce a completed Project that <br />conforms to the Contract Documents or that will prejudice the <br />integrity of the design concept of the completed Project as a <br />functioning whole as indicated by the Contract Documents. <br />ENGINEER will also have authority to require special inspection <br />or testing of the Work as provided in paragraph 13.04, whether <br />or not the Work is fabricated, installed, or completed. <br />9.07 Shop Drawings, Change Orders and Payments <br />A. In connection with ENGINEER's authority as to Shop <br />Drawings and Samples, see paragraph 6.17. <br />B. In connection with ENGINEER's authority as to <br />Change Orders, see Articles 10, 11, and 12. <br />C. In connection with ENGINEER's authority as to <br />Applications for Payment, see Article 14. <br />9.08 Determinations for Unit Price Work <br />A. ENGINEER will determine the actual quantities and <br />classifications of Unit Price Work performed by CONTRACTOR. <br />ENGINEER will review with CONTRACTOR the ENGINEER's <br />preliminary determinations on such matters before rendering a <br />written decision thereon (by recommendation of an Application <br />for Payment or otherwise). ENGINEER's written decision <br />thereon will be final and binding (except as modified by <br />ENGINEER to reflect changed factual conditions or more <br />accurate data) upon OWNER and CONTRACTOR, subject to <br />the provisions of paragraph 10.05. <br />9.09 Decisions on Requirements of Contract Documents <br />and Acceptability of Work <br />A. ENGINEER will be the initial interpreter of the <br />requirements of the Contract Documents and judge of the <br />acceptability of the Work thereunder. Claims, disputes and <br />other matters relating to the acceptability of the Work, the <br />quantities and classifications of Unit Price Work, the <br />interpretation of the requirements of the Contract Documents <br />pertaining to the performance of the Work, and Claims seeking <br />changes in the Contract Price or Contract Times will be referred <br />initially to ENGINEER in writing, in accordance with the <br />provisions of paragraph 10.05, with a request for a formal <br />decision. <br />B. When functioning as interpreter and judge under this <br />paragraph 9.09, ENGINEER will not show partiality to OWNER <br />or CONTRACTOR and will not be liable in connection with any <br />interpretation or decision rendered in good faith in such <br />capacity. The rendering of a decision by ENGINEER pursuant <br />to this paragraph 9.09 with respect to any such Claim, dispute, <br />00700 General Conditions (EJCDC).doc <br />1I101j031M <br />1907-02912Inch N-Vemlake Estates\Documents\Rryens\aidding Contrera Sirmific9ions\00700 General Canditions(E)CDC).doc <br />