My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-403
CBCC
>
Official Documents
>
2000's
>
2007
>
2007-403
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/14/2025 10:04:57 AM
Creation date
9/30/2015 11:28:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
11/20/2007
Control Number
2007-403
Agenda Item Number
11.J.2
Entity Name
Sheltra and Sons Construction
Subject
Master Planned Water Transmission Main
Area
Vero Lakes Estates
Project Number
UCP 2958
Bid Number
2008015
Supplemental fields
SmeadsoftID
6699
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
158
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Application to OWNER or return the Application to <br />CONTRACTOR indicating in writing ENGINEER's <br />reasons for refusing to recommend payment. In the <br />latter case, CONTRACTOR may make the necessary <br />corrections and resubmit the Application. <br />2.ENGINEER's recommendation of any payment <br />requested in an Application for Payment will constitute a <br />representation by ENGINEER to OWNER, based on <br />ENGINEER's observations on the Site of the executed <br />Work as an experienced and qualified design <br />professional and on ENGINEER's review of the Appli- <br />cation for Payment and the accompanying data and <br />schedules, that to the best of ENGINEER's knowledge, <br />information and belief: <br />a. the Work has progressed to the point <br />indicated; <br />b. the quality of the Work is generally in accor- <br />dance with the Contract Documents (subject to an <br />evaluation of the Work as a functioning whole prior <br />to or upon Substantial Completion, to the results of <br />any subsequent tests called for in the Contract <br />Documents, to a final determination of quantities <br />and classifications for Unit Price Work under <br />paragraph 9.08, and to any other qualifications <br />slated in the recommendation); and <br />c. the conditions precedent to <br />CONTRACTOR's being entitled to such payment <br />appear to have been fulfilled in so far as it is <br />ENGINEER's responsibility to observe the Work. <br />3. By recommending any such payment ENGI- <br />NEER will not thereby be deemed to have represented <br />that: (i) inspections made to check the quality or the <br />quantity of the Work as it has been performed have <br />been exhaustive, extended to every aspect of the Work <br />in progress, or involved detailed inspections of the Work <br />beyond the responsibilities specifically assigned to <br />ENGINEER in the Contract Documents; or (ii) that there <br />may not be other matters or issues between the parties <br />that might entitle CONTRACTOR to be paid additionally <br />by OWNER or entitle OWNER to withhold payment to <br />CONTRACTOR. <br />4.Neither ENGINEER's review of <br />CONTRACTOR's Work for the purposes of recom- <br />mending payments nor ENGINEER's recommendation <br />of any payment, including final payment, will impose <br />responsibility on ENGINEER to supervise, direct, or <br />control the Work or for the means, methods, techniques, <br />sequences, or procedures of construction, or the safety <br />precautions and programs incident thereto, or for CON- <br />TRACTOR's failure to comply with Laws and Regu- <br />lations applicable to CONTRACTOR's performance of <br />the Work. Additionally, said review or recommendation <br />will not impose responsibility on ENGINEER to make <br />any examination to ascertain how or for what purposes <br />CONTRACTOR has used the moneys paid on account <br />of the Contract Price, or to determine that title to any of <br />the Work, materials, or equipment has passed to <br />OWNER free and clear of any Liens. <br />5.ENGINEER may refuse to recommend the whole <br />or any part of any payment if, in ENGINEER's opinion, it <br />would be incorrect to make the representations to <br />OWNER referred to in paragraph 14.02.B.2. ENGI- <br />NEER may also refuse to recommend any such pay- <br />ment or, because of subsequently discovered evidence <br />or the results of subsequent inspections or tests, revise <br />or revoke any such payment recommendation <br />previously made, to such extent as may be necessary in <br />ENGINEER's opinion to protect OWNER from loss <br />because: <br />a. the Work is defective, or completed Work <br />has been damaged, requiring correction or replace- <br />ment; <br />b. the Contract Price has been reduced by <br />Written Amendment or Change Orders: <br />c. OWNER has been required to correct <br />defective Work or complete Work in accordance <br />with paragraph 13.09; or <br />d. ENGINEER has actual knowledge of the <br />occurrence of any of the events enumerated in <br />paragraph 15.02.A. <br />C. Payment Becomes Due <br />1.Ten days after presentation of the Application for <br />Payment to OWNER with ENGINEER's recommenda- <br />tion, the amount recommended will (subject to the <br />provisions of paragraph 14.020) become due, and <br />when due will be paid by OWNER to CONTRACTOR. <br />D. Reduction in Payment <br />1.0WNER may refuse to make payment of the full <br />amount recommended by ENGINEER because: <br />a. claims have been made against OWNER <br />on account of CONTRACTOR's performance or fur- <br />nishing of the Work; <br />b. Liens have been fled in connection with the <br />Work, except where CONTRACTOR has delivered <br />a specific Bond satisfactory to OWNER to secure <br />the satisfaction and discharge of such Liens; <br />c. there are other items entitling OWNER to a <br />set -of against the amount recommended; or <br />d. OWNER has actual knowledge of the occur- <br />rence of any of the events enumerated in para- <br />graphs 14.02.B.5.a through 14.02.B.5.c or para- <br />graph 15.02.A. <br />2 -If OWNER refuses to make payment of the full <br />amount recommended by ENGINEER, OWNER must <br />give CONTRACTOR immediate written notice (with a <br />copy to ENGINEER) stating the reasons for such action <br />and promptly pay CONTRACTOR any amount <br />remaining after deduction of the amount so withheld. <br />OWNER shall promptly pay CONTRACTOR the <br />amount so withheld, or any adjustment thereto agreed <br />to by OWNER and CONTRACTOR, when CONTRAC- <br />00700 General Conditions (E1CDC).doc <br />00700-31 <br />1907-039 121nch WM - Vero Lake atates` DocumrntsV epodstaidding Contract Speciticatlons100700 General Conditions (UCDC).doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.